STATIC pile load TEST MANUAL GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4 AUGUST 2015 EB 15-025 Page 1 of 55 GEOTECHNICAL CONTROL PROCEDURE: STATIC pile load TEST MANUAL GCP-18 Revision #4 STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING BUREAU AUGUST 2015 EB 15-025 Page 2 of 55 TABLE OF CONTENTS I. pile TEST LOADS AND load APPLICATION SYSTEMS ..5 A. Types of Reaction Loads ..5 B. load Application System ..8 II. MEASURING APPARATUS AND SITE PROTECTION ..10 A. Primary System ..10 B. Auxiliary Systems ..24 C. Settlement Reference Points ..24 D. Site Protection ..25 III. REQUIREMENTS PRIOR TO TESTING ..26 A. Waiting Period ..26 B. Control of pile Heave ..26 C. Special Procedures for Cast-In-Place Piles and Drilled Shafts ..26 D. Special Procedure for Micropiles.
appropriately detailed drawings for approval by the D.C.E.S. B. LOAD APPLICATION SYSTEM Apply load with one or more hydraulic jacks, having a capacity of at least four times the pile design load indicated in the contract documents. Use jacks with a minimum travel of 6 in. (150
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}