STATIC pile load TEST MANUAL GEOTECHNICAL control PROCEDURE GCP-18 Revision #4 AUGUST 2015 EB 15-025 Page 1 of 55 GEOTECHNICAL control PROCEDURE: STATIC pile load TEST MANUAL GCP-18 Revision #4 STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING BUREAU AUGUST 2015 EB 15-025 Page 2 of 55 TABLE OF CONTENTS I. pile TEST LOADS AND load APPLICATION SYSTEMS ..5 A. Types of Reaction Loads ..5 B. load Application System ..8 II. MEASURING APPARATUS AND SITE PROTECTION ..10 A. Primary System ..10 B. Auxiliary Systems ..24 C. Settlement Reference Points ..24 D. Site Protection ..25 III. REQUIREMENTS PRIOR TO TESTING ..26 A. Waiting Period ..26 B. control of pile Heave.
supplement to control load application. Use a pressure gage for the jack so that the pressure reading corresponding to the pile design load indicated in the contract documents is between one-fourth and one-third of maximum gage pressure. Place a load cell (either electric or
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}