PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: confidence

Stormwater Management Objectives

NCDENR Stormwater BMP Manual Chapter Revised 06-16-09. 3. Stormwater Calculations Stormwater Management Objectives The objective of BMPs is to minimize the adverse effects of development by mimicking, as closely as possible, the runoff characteristics of the site in its undeveloped state. These characteristics include: Moderation of runoff peak flows and volumes to minimize downstream erosion and damage to in-stream aquatic habitat. Removal of pollutants such as sediment, nutrients, pathological bacteria and heavy metals. Infiltration of rainfall to replenish the water table and provide stable base flow to streams. The preferred Stormwater Management approach is to preserve the natural storage, infiltration, and pollutant-treatment functions of each drainage area where practical, and where not practical to construct BMPs that mimic those natural functions as closely as possible.

Stormwater calculations are required to analyze a proposed new development for its impacts on peak flows and volumes. Stormwater programs in North Carolina typically include provisions to control and treat a certain volume of stormwater runoff and/or provisions to control the peak stormwater discharge rate. Additional calculations are

Loading..

Tags:

  Management, Control, Stormwater, Stormwater management

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Stormwater Management Objectives

Related search queries