Transcription of Surface Preparation Requirements - Mapei
{{id}} {{{paragraph}}}
Surface Preparation Requirements Tile & Stone Installation Systems REFERENCE GUIDE RGT0309. Revised November 30, 2015. ENVIRONMENTAL Requirements Completely remove all paint, loosely bonded topping, loose particles Maintain environmental conditions and protect work during and after and construction debris by mechanical means (that is, shotblasting, installation. Comply with trade and industry standards and scarification, sanding or grinding). When preparing surfaces manufacturer's printed recommendations. containing silica sand, use a dust mask or respirator approved by the National Institute for Occupational Safety and Health (NIOSH). Refer to Mapei 's current Technical Data Sheets (TDSs) for the recommended application temperature range for all Mapei products Warnings: A) Do not install over vinyl asbestos tile (VAT) or any used in the installation.
REFERENCE GUIDE RGT0309 Revised November 30, 2015 Surface Preparation Requirements Tile & Stone Installation Systems ENVIRONMENTAL REQUIREMENTS • Maintain ...
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}