PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: tourism industry

Takt Time - Lean Six Sigma

takt time Training PackWhich of these is Important to Our business? Satisfied Customers Profit Growth Market Share Effective use of its people and plant Maximum Capacity ProductionWhy Not Maximum Capacity?Producing more than the customer requires is:This is the greatest of the Seven WastesAs it leads to occurrence of the other sixOVER-PRODUCTIONThe Western ApproachWe produce more than we require to allow for problemsThis embeds waste in our business123 Push production SystemCustomerIf we consider production operations as a link producing in isolation at full speed will cause a mismatch between linksSome areas over-produce, some cannot keep ? Push production SystemCustomerWhat will happen when a link in the chain breaksWithin a Push System? Push production SystemCustomerThe individual links keep building to schedule chain soon backs up Push production SystemCustomerWhen we consider the wider see why stock is present.

Takt Time, an enabler for Flow If work balance is set to Takt, the process closest the customer can pull production through the system at the right pace.

Tags:

  Time, Production, Work, Takt time, Takt

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Takt Time - Lean Six Sigma

Related search queries