Transcription of Technical requirements and Work Instructions for Minor ...
{{id}} {{{paragraph}}}
Minor Works sewer Technical requirements and work Instructions Document current at DD Month YYYY Page 0 Technical requirements and Work Instructions for Minor Works (sewer) Version 4 - November 2015 Sydney Water Technical requirements and Work Instructions for Minor Works (sewer) Version 4 - November 2015 Page 1 Change history Version Key changes Prepared by Date Approved for use 1 Original Issue to replace abbreviated standard specification for the construction of Minor Works (sewer) dated March 1997 FM, WK, BN Aug 2004 BN 2 Changes to scope, format of work Instructions and drawings WK, MH, BN July 2005 BN 3 Changes to scope, inclusion of Leak Tight Sewer specification property connection arrangement, and general revision HP, LS Sept 2015 KW 4 Change Quick Check references to Sydney Water Tap inTM BH, HP Nov 2015 KW Sydney Water Technical requirements and Work Instructions for Minor Works (sewer) Version 4 - November 2015 Page 2 Definitions 3 Abbreviations of the Minor Works (sewer) requirement and servicing below ground fixtures(such as in basements) Soffit 8 Servicing below ground fixtures (such as in basements) 9 and materials97.
Minor Works sewer Technical requirements and work instructions Document current at DD Month YYYY Page 0 Technical requirements and Work Instructions for Minor Works (sewer)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}