Premier -PIPE USA. TECHNICAL SPECIFICATION . CURED-IN-PLACE PIPE. Section Page #. PART 1 GENERAL. THE REQUIREMENT 1. REFERENCE SPECIFICATIONS, CODES AND STANDARDS 1. CONTRACTOR SUBMITTALS 1. QUALITY ASSURANCE 2. WARRANTY 2. PART 2 PRODUCTS. MATERIALS 2. PHYSICAL PROPERTIES 3. PART 3 EXECUTION. PREPARATION 4. INSTALLATION 5. SERVICE LINE RECONNECTION 6. TESTING 6. PART 4 PAYMENT. CURED-IN-PLACE PIPE 7. GROUTING OF SEVER DEFECTS 7. SERVICE LINE RECONNECTIONS 7. Premier -Pipe USA TECHNICAL Specifications Revision 03/08/11. PART 1 GENERAL. THE REQUIREMENT. A. This SPECIFICATION covers the work necessary to furnish and install complete, cured-in-place pipe (CIPP). The CONTRACTOR shall provide all materials, labor, equipment, and services necessary for bypass pumping and/or diversion of sewage flows, cleaning and television inspection of sewer to be lined, finer installation, reconnection of service connections, and final television inspection and testing of lined pipe system.
Premier-Pipe USA Technical Specifications Revision 03/08/11 Page 3 B. Resin 1. Unless otherwise specified, provide a general purpose, unsaturated, thermosetting, polyester, vinyl ester, or epoxy resin able to cure in the presence or absence of water, and a …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}