TECHNICAL SPECIFICATION Construction of 33/11 KV Primary Sub-Stations. 1 GENERAL Scope of work A. Supply In the package materials have been classified as under i. Owner s supply materials (OSM) 33/11 KV Power Transformers, Station 33 KV Transformers , VCB, kiosk, CT, PT, CR panels, LA,33KV Isolator,11KV AB Switch & HG Fuse, Battery with Charger, ABCD, SDB, Light Fittings, Control Cable ,Structures, Hardware etc. ii. Contractor s scope All other material except the items shown above such as cements, different type of aggregate, bricks, Heat shrink type end connector (for all level), earthing materials, Foundation Materials, all Civil works Materials and other consumable required to complete the job. B. Construction of 33 / 11 KV Sub-Stations Sl.
Sub-station work, equipments data, operational manual, etc for the Owner’s approval; (iv) Packing and transportation from the NESCO Store to the site.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Technical specification content, Work, Technical, FLOORING SPECIFICATION, Specification, ERECTION OF 66KV LINES, Technical specification, TECHNICAL SPECIFICATION PRELIMINARIES AND, TECHNICAL SPECIFICATION PRELIMINARIES AND PREAMBLE CLAUSES, TECHNICAL SPECIFICATION ALL ALUMINIUM, TECHNICAL SPECIFICATION ALL ALUMINIUM ALLOY CONDUCTOR, Technical specification for, Technical Specification for CNC Horizontal milling, SPECIFICATION FOR ASTM