Transcription of TR1: Technical Report Statement of Responsibility
{{id}} {{{paragraph}}}
TR1: Technical Report Statement of Responsibility This form must be typewritten TR1 August 2016 House No(s) Street Name Work on Floor(s) 1 Location Information Required for all applications. 3 Special inspection Categories Required for all applications, continued on page 2; indicates Report required. 3A Identification of Requirement 3B Identification of Responsibilities 3C Certificate of Complete Inspections / Tests 3D Withdraw Responsibilities Y N Special Inspections Code/Section Initial & Date Initial & Date Initial & Date Structural Steel Welding BC Structural Steel Details BC Structural Steel High Strength Bolting BC Structural Cold-Formed Steel BC Concrete Cast-In-Place BC Concrete Precast BC Concrete Prestressed BC Masonry BC Wood Installation of High-Load Diaphragms BC Wood Installation of Metal-Plate-Connected Trusses BC
TR1: Technical Report Statement of Responsibility This form must be typewritten TR1 August 2016 3 Special Inspection Categories (continued) Required for all applications, continued on page 2; indicates report required. 3A ← Identification of Requirement 3B Identification of
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
MICHIGAN RESIDENTIAL CODE 2003, Masonry, Section, Building Inspection Report, Inspection, Building Code Requirements for Masonry Structures, Special Inspection Manual, Connecticut Department of Environmental Protection, SECTION R319 PROTECTION AGAINST DECAY, Michigan Residential Code Booklet, REFERENCE STANDARD RS-10, Reference Standard