Transcription of UH-60 FSXXI Run-up through Shut-down Air Crew …
{{id}} {{{paragraph}}}
7 October 2008 Current with TM 1-1520-237-10/CL dated 17 April 2006 changes 1 / 2 / 3 1 UH-60 FSXXI Run-up through Shut-down Air Crew Coordination BEFORE STARTING ENGINES W WARNING Before engine operation can be preformed; all main rotor tie downs shall be removed. 1. Copilot s collective- Extended and locked. PILOT READING CHECKLIST ACTION PILOT RESPONDING Copilot s collective- extended and locked Extend collective full forward and rotate counter-clockwise. Extended and locked 2. Shoulder harness locks- Check. W WARNING If performing a mission with an Air Warrior ballistic upgrade plate (BUP), the seat belt buckle must be positioned below the BUP to prevent potential aft cyclic restriction.
7 October 2008 Current with TM 1-1520-237-10/CL dated 17 April 2006 changes 1 / 2 / 3 6 Loud and clear fireguard 8.19 COCKPIT EQUIPMENT CHECKS.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}