Transcription of VENDOR OPERATIONS MANUAL
{{id}} {{{paragraph}}}
BOP LLC CONFIDENTIAL 1 June 19, 2019 VENDOR OPERATIONS MANUAL BOP LLC CONFIDENTIAL 2 June 19, 2019 TABLE OF CONTENTS 1. WELCOME ) HOW TO USE THIS MANUAL 2. GENERAL ) CREDIT LIMIT ) RIGHT TO INSPECT ) VENDOR COMPLIANCE AND STANDARDS ) CHARGEBACK ) SHIPPING WINDOW ) LITHIUM-ION, LITHIUM METAL, OR RECHARGEABLE BATTEREIS ) HAZARDOUS MATERIALS 3. VENDOR AUDITS 4. GOLBAL TRADE IDENTIFICATION NUMBERS (GTIN, UPCs or EAN) ) INDUSTRY STANDARD REFERENCES ) PROVIDING BOP LLC WITH GTIN/UPC/EAN DATA )1. CATALOG PROVIDERS )2. NON-CATALOG VENDORS ) GTIN/UPC/EAN MARKING REQUIREMENTS 5. PACKAGING AND LABELING REQUIREMENTS ) TICKETING ) PRODUCT INFORMATION/LABELING )1. CARE INSTRUCTION LABELING )2. PRODUCT LABELING )3. SPECIFICATION SHEETS ) PACKAGING 6.
The ship window is specified by two dates on the Purchase Order (“PO”). The first is referred to as a “start date” and the second is referred to as a “cancel date”. POs should not be shipped to arrive before the START DATE and are expected to be in the BOP LLC Fulfillment Center no later than the CANCEL DATE.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}