BRIDGE CONSTRUCTION RECORDS & PROCEDURES MANUAL BCB ATTACHMENT NO. 2 06/01/2000 PAGE 5 OF 19 WELDING QUALITY CONTROL CHECKLIST Prior to Beginning Any WELDING Work The following contract documents should be reviewed before starting any WELDING work: Specific References: Standard Specifications Sections: Section , Testing by Contractor Sections 49, 52, 55, 56, 75 and 86 (as applicable to the work) American WELDING Society (AWS) - AWS , , (appropriate year) AWS : Prequalification of WPS, Qualification, an Inspection AWS : Direct Butt Joint Figure , Workmanship, Technique, Qualifications and Inspection AWS.
Jun 01, 2000 · The submittal and approval process for the WQCP. Supply and explain OSM form QCP-1 (attachment 4) to the contractor. Form QCP-1 is a checklist of the minimum requirements for the WQCP. The contract documents may require additional information to be submitted with the contractor’s WQCP beyond those
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}