Transcription of What are the General Rules
{{id}} {{{paragraph}}}
Compliant Photos This is intended for overview purposes only. For complete underwriting Rules and guidelines, please refer to the NFIP Manual 2021 Wright Flood. No Reproduction Without Permission. Call Flood Marketing (866) 373-5663 Elevation certificates (EC) require at least two photos of the building; it is not compliant without photos. What are compliant photos? At least 3 X 3 dated within 90 days of the submission date. The third page of the EC can show photos attached. A Statement of Photo Date can also be signed by the agent and sent in along with the photos supplied as an acceptable alternative; and The photo must show the building s foundation; and If vents exist, the photos must show the venting; and The photos must show two sides of the building.
Compliant Photos This is intended for overview purposes only. For complete underwriting rules and guidelines, please refer to the NFIP Manual
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}