Office of Construction and Facilities Management (003C). 425 I Street NW. Washington, DC 20001. Whole Building Commissioning Process Manual May 1, 2013. minor revisions 11/01/2013. Prepared by: Sebesta Blomberg and Associates, Inc. Contact: Gerald T. Bauers, PE. 2231 Crystal Drive, Suite 400. Arlington, VA 22202. Main: 703-522-3800. Fax: 703-522-8070. Email: Commissioning Process Manual Acknowledgements Acknowledgements Many professionals in the Department of Veterans Affairs generously contributed their expertise to guide this edition of the Whole Building Commissioning Process Manual .
Commissioning and acceptance testing is integral to the design and construction process, not additive. Execution of commissioning tasks is intended to enhance the ability of the design and construction team to meet demanding building performance requirements while maintaining project budget and schedule. The
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Softstarters Type PSE18PSE370 Installation and, And commissioning, Com-missioning, Commissioning, NIBS Guideline 3-2012, Commissioning Policy: Ethical framework for, Commissioning Policy – Ethical Framework, National Dose Banding Table Single Container, National Dose Banding Table – Single Container