Work at Height Procedure - Tata Power

Note: Uncontrolled once printed Page 1 of 16 The Tata Power Company Ltd Document Title Work At Height Procedure Document Ref No: TPSMS/CSP/WAH/004 Rev 01 Date of Issue: 01/01/2016 WORK AT Height Procedure Rev No. Reason for Revision Prepared By Reviewed By Approval by Rev 00 Initial Release Navendra Singh Sanjay Kale Shrinivas Katti Rev 01 Standardization of Procedure Anil Jain ( Head Operation Trombay) Navendra Singh (Group Head P Corp Safety.) Vijay Chourey (Chief Corp Safety) Note: Uncontrolled once printed Page 2 of 16 The Tata Power Company Ltd Document Title Work At Height Procedure Document Ref No: TPSMS/CSP/WAH/004 Rev 01 Date of Issue: 01/01/2016 Contents Section Description Page No.

transmission towers and conductors, inside confined spaces, sloped roofs, areas where there are no overhead tie-off points, when working within 6 feet (1.8mt) of the edge of a flat roof, erecting steel or installing/replacing roofing and in pipe racks. This does not include normal work on low stepladders, loading platforms, or similar locations.

Loading..

Tags:

  Procedures, Transmissions

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Work at Height Procedure - Tata Power

Related search queries