Example: air traffic controller
Building Information Modelling (BIM) Execution Plan
with the NBS BIM Toolkit Specification. Refer to Appendix D of the EIR. 4.2.2 Geometric information requirements – Model Production Delivery Table The level of development required at each project work stage (RIBA PoW 2013) and the party responsible for delivering that information is defined in Appendix A. This
Download Building Information Modelling (BIM) Execution Plan
Information
Domain:
Source:
Link to this page: