Oct 18, 2004 · Set a second back-up offset hub and lath for line and distance to centerline only, well beyond the original offset in fill sections. Set the back-up offset hub as far back as possible staying inside of right of way. Many times the offset hubs are destroyed accidentally during the construction of the slopes and all references to centerline are lost