Chapter 3: Equipment Productivity

Chapter 3: Equipment Productivity

Back to document page

Cost 3.4 Preventive Maintenance 3.5 Mobilization ofE quipment 3.1 Introduction Whether a construction contract is unit pricle,ump sum, or cost-plus; whether the construction project is to be linear (i.e., concept ∅ design ∅ procurement ∅ construction) or fast-track (i.e., design/build), the cost of construction is a major factor in all ...