Integrity and leak testing. At the time of installation, modification, construction, relocation, or replacement. All aboveground valves, piping, and appurtenances 112.8(d)(4) or 112.12(d)(4) Inspect During the inspection, assess general condition of items, such as flange joints, expansion joints, valve glands and bodies,