Example: quiz answers
DETENTION FACILITY DESIGN AND ANALYSIS

DETENTION FACILITY DESIGN AND ANALYSIS

Back to document page

Overflow . 1. In all ponds, tanks, and vaults, a . primary overflow (usually a riser pipe within the control structure; see Section 5.1.4.2, p. 5-32) must be provided to bypass the 100-year, 15-minute developed peak flow over or around the restrictor system. This assumes the facility will be full due to plugged orifices or

  Overflow

Download DETENTION FACILITY DESIGN AND ANALYSIS


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Related search queries