DETENTION FACILITY DESIGN AND ANALYSIS

Overflow . 1. In all ponds, tanks, and vaults, a . primary overflow (usually a riser pipe within the control structure; see Section 5.1.4.2, p. 5-32) must be provided to bypass the 100-year, 15-minute developed peak flow over or around the restrictor system. This assumes the facility will be full due to plugged orifices or