2. Design-Bid-Build Procurement: a. Low Bid: The construction contractor is selected through a competitive bid process where the offeror with the lowest bid is usually awarded the contract. Construction contracts are awarded based upon low competitive bids and bonding is required as part of the Invitation for Bids (IFB).