Guide to Standards and Tolerances (currently under review)
9.13 Level of finish for plasterboard 50 9.14 Cracking in plasterboard, hard plaster and other plaster elements 50 9.15 Cracking in cornices 51 9.16 Cracking at junctions of dissimilar materials 51 9.17 Straightness and alignment of plaster cornices 51 9.18 Peaking or jointing in plasterboard 51 9.19 Nail popping in surfaces 51
Download Guide to Standards and Tolerances (currently under review)
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Technical Solution Sheet 0 - Home | VBA
www.vba.vic.gov.auTechnical Solution Sheet 0.04 0: Roof Plumbing . Duplicate solution of 4.04 (Drainage) Updated February 2016 . www.vba.vic.gov.au . Page 1 of . 6. Roof …
Solutions, Sheet, Technical, Roof, Drainage, Plumbing, Technical solution sheet, Roof plumbing
VBA POOL AND SPA SAFETY BARRIER SELF-ASSESSMENT …
www.vba.vic.gov.auQUESTIONS YES NO DIAGRAM STEP 1 – BARRIER OBJECTIVE: SWIMMING POOLS AND SPAS MUST BE SURROUNDED BY A BARRIER RESTRICTING UNSUPERVISED ACCESS BY YOUNG CHILDREN. a) If your pool or spa barrier was approved between 8 April 1991 and 31 October 1994, complete Steps 2, 3 and 8. b) If your pool or spa barrier was approved between 1 November 1994 …
Owner-Builder - Information and Study Guide
www.vba.vic.gov.au3. An owner-builder is someone who takes responsibility for domestic building work carried out on their land and is legally responsible for the project from start to finish.
Drainage Below Ground Stormwater Sizing Drains and …
www.vba.vic.gov.aucalculations. (see Appendix A) SAA/SNZ HB114 for example calculations for typical roof styles. (see page 14 step 2) for the method using the slope factor for a pitched roof to an eaves gutter (hip & valley with no abutting vertical walls or flat roofs). The catchment area of a roof and any
Methods, Stormwater, Roof, Appendix, Sizing, Ground, Below, Drainage, For oa, Drainage below ground stormwater sizing
Bushfire Attack Level Assessment Report
www.vba.vic.gov.au• a non-habitable building being a private garage, carport, shed, or the like. Class 2 • a building containing 2 or more sole-occupancy units, each being a separate dwelling. Class 3 • a residential building, other than a building of Class 1 or 2, which is a …
3: Drainage (below ground sewer)
www.vba.vic.gov.au3: Drainage (below ground sewer) Updated June 2014 www.vba.vic.gov.au Page 1 of 6 Property Sewerage Drains AIM The aim of this technical solution is to inform practitioners about some of the requirements for below ground sanitary drains. This technical solution may be read in conjunction with the
Ground, Below, Sewer, Drainage, Below ground, Below ground sewer
Plumbing Fact Sheet: Overflow provision for box gutters
www.vba.vic.gov.auAs an alternative, the top of the rainhead may be installed so that it is no higher than 50 per cent of the flow depth of the box gutter, consistent with SAA HB39 Installation code for metal roof and wall cladding Section 5 Clause 5.7.3, and Figure 5.7.3 to prevent internal flooding or damage to the building or contents (see Figure 2).
Provisions, Alternatives, Gutter, Overflow, Overflow provision for box gutters
Commercial Builder Registration Application
www.vba.vic.gov.auscaffolding, traffic management) Prepared/obtained bills of quantity/schedule of rates Assessed and monitored budgets for the building project Continued Supervised subcontractors/ trades to ensure work was conducted safely and to standard Managed site safety throughout the project Area of Experience (AoE) 6 – Cont. Commercial construction phase
CERTIFICATE OF COMPLIANCE FOR PROPOSED BUILDING …
www.vba.vic.gov.auApproved by the Victorian Building Authority Page 1 of 3. ... or part of the design, set out in the documents listed above. (delete if peer review) I certify that the design set out in the documents listed above complies with the provisions set out above.
Installation of Fixtures for Disabled Persons Building ...
www.vba.vic.gov.auof the WC pan has been taken as the datum plane The dimensions of 800 mm plus or minus 10mm from the front of the WC pan to the wall is a critical dimension. Technical Solution Sheet 1.04 Updated June 2014 ... FIGURE 4 – GRADES FOR BATHROOM AND SHOWER FLOORS (SOURCE: AS 1428.1)
Installation, Building, Persons, Disabled, Shower, Fixtures, Installation of fixtures for disabled persons building
Related documents
Residential Construction Standards - South Carolina
www.llr.sc.govThe following Construction Standards are expressed in terms of performance standards. Noncompliance with the performance standard calls for corrective action by the Builder. The format is designed for easy comprehension by both layman and builder as follows:
IS 2185-1 (2005): Concrete masonry units, Part 1: Hollow ...
www.iitk.ac.inplaster, gauged with lime or a plasticizer. Concrete masonry units provide a strong mechanical key, uniting the concrete masonry backing and the plaster finish in a strong permanent bond. Concrete masonry units are used for both load-bearing and non …
STIX - Benjamin Moore & Co.
media.benjaminmoore.comSep 09, 2019 · plaster, drywall, wood, and non-ferrous metals, where a low ambient or surface temperature would present a problem for conventional primers. Offers an extremely hard film when cured. Use it on interior and exterior surfaces and topcoat with almost any type of coating including Alkyd, Acrylic Latex, Urethane, Epoxy, and Lacquer Finishes.
NuTone AVDF1, AVSF1 and AVSF1-2 Series Installation …
images.thdstatic.comPainted Finish Cleaning ... person(s) in accordance with all applicable codes and standards, including fire-rated construction. • Sufficient air is needed for proper combustion and exhausting of ... • Let plaster dust or any other construction residues reach the hood. During construction/
IS 1200-13 (1994): Method of measurement of building and ...
law.resource.orgb) Sand face plaster with up to 4 rom Slze 50 percent c) Rough cast plaster with stone aggregate up to 10 mm-IOOpercent d) Pebble dash finish beyond 10 mm-275 percent e) Sponge finished plaster-25percent 3.7 For RCC jallies up to 50 rom thick, the quantity shall be increased by 50 percent, if painted 011 one side and 70 percent» if paintedon
USG Solutions USG SHEETROCK BRAND PLUS 3 JOINT …
www.usg.comCompliance with Standards: Meets ASTM C475, Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board. Storage: Store at 55-95°F (13-35°C) in a dry location. Protect from freezing, extreme heat and exposure to direct sunlight. Keep container tightly sealed. Do not use if material is discolored or has an unpleasant odor.
Solutions, Standards, Plus, Brand, Sheetrock, Usg solutions usg sheetrock brand plus
BACK-LIT TROFFER - hubbellcdn
hubbellcdn.com• For plaster or sheet rock installations, use flange kit accessories ELECTRICAL • 60,000 hour LEDs at L70 for reduced maintenance • Operates at 120–277V • Dimming capability at 120V only • Switchable Lumen technology allows for easy field-adjustable lighting output with three level switch located on back of panel
QUALITY STANDARDS FOR ARCHITECTURAL WORKS
www.bca.gov.sgStandards 6 Architectural Coating 1) Substrate - see plaster finish 2) Finished texture and colour to be uniform 3) No paint drips and other stains 7 Painting 1) Substrate - see plaster finish 2) Surfaces are evenly painted; no patchiness due to touch up work 3) Good opacity, no discolouring and free from peeling