Example: marketing
LEAD FREE Series LF009 - Watts

LEAD FREE Series LF009 - Watts

Back to document page

The assembly shall also include two resilient seated isolation valves, four resilient seated test cocks and an air gap drain fitting. The assem-bly shall meet the requirements of: USC; ASSE Std. 1013; AWWA Std. C511; CSA B64.4. Shall be a Watts Series LF009. Test Cock No. 3 Test Cock No. 4 R.P. Zone Water Outlet Test Cock No. 2 First Check ...

  Isolation, Valves, Isolation valves

Download LEAD FREE Series LF009 - Watts

15
Please wait..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Related search queries