Technical Data Sheet
Surface (touch) dry Walk-on-dry 5 h2.5 h1 h 16 h8 h3.5 h 14 d7 d3 d Substrate temperature 10 °C23 °C40 °C Dried/cured for service Dry to over coat, minimum 16 h8 h3.5 h Walk-on-dry: Minimum time before the coating can tolerate normal foot traffic without permanent marks, imprints or other physical damage.
Download Technical Data Sheet
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Advertisement
Documents from same domain
Technical Data Sheet - Jotun
www.jotun.comTechnical Data Sheet Hardtop Flexi The provided data is typical for factory produced products, subject to slight variation depending on colour. Gloss description: According to …
Technical Data Sheet Application Guide
www.jotun.comEpoxy HR Product description This is a two component polyamine cured phenolic/novolac epoxy coating. It is heat resistant up to 205 °C (401 °F) and can be applied on hot substrates up to 150 °C (302 °F).
Technical Data Sheet
www.jotun.comTechnical Data Sheet Epoxy HR Surface preparation summary table Substrate Minimum Recommended Carbon steel St 2 (ISO 8501-1) Sa 2½ (ISO 8501-1) Stainless steel The surface shall be hand or machine
Technical Data Sheet Application Guide
www.jotun.comApplication Guide 3140;3240;4320 1,2 3140 Scope The Application Guide offers product details and recommended practices for the use of the product. The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety Data Sheet (SDS) for all the products used as part of the coating system.
Technical Data Sheet - Jotun
www.jotun.comOptimum performance, including adhesion, corrosion protection, heat resistance and chemical resistance is achieved with recommended surface preparation. Date of issue:22 March 2021 Page: 3/7 This Technical Data Sheet supersedes those previously issued.
Technical Data Sheet - Jotun
www.jotun.comPackaging (typical) The volume stated is for factory made colours. Note that local variants in pack size and filled volumes can vary due to local regulations. Size of containers (litres) Aluminium Paint H.R. 5 5 Storage Volume (litres) Depending on the actual exposure of the coating system, various primers and topcoats can be used in
Technical Data Sheet Jotamastic 87 Aluminium
www.jotun.comPackaging (typical) The volume stated is for factory made colours. Note that local variants in pack size and filled volumes can vary due to local regulations. Size of containers Jotamastic 87 Wintergrade Comp B 4 5 (litres) Jotamastic 87 Standard Comp B 2.7 Jotamastic 87 Aluminium Comp A 14.7 20 3 Volume (litres) Date of issue:27 June 2017 Page ...
Technical Data Sheet
www.jotun.comLEED®v4 (2013) MR credit: Building product disclosure and optimization - Material Ingredients, Option 2: Material Ingredient Optimization, International Alternative Compliance Path - REACH optimization: Fully inventoried chemical ingredients to 100 …
Technical Data Sheet
www.jotun.comThis is a two component amine cured epoxy coating. It is a fast drying, zinc phosphate pigmented, high solids, high build product. Specially designed for new construction where short dry to handle and over coating times are required. Can be used as primer, mid coat, finish coat or as single coat system in atmospheric environments.
SAFETY DATA SHEET - Jotun
www.jotun.com1.3 Details of the supplier of the safety data sheet Product type :Liquid. Product description :Paint. 1.2 Relevant identified uses of the substance or mixture and uses advised against SECTION 1: Identification of the substance/mixture and of the company/ undertaking Product code :3140 1.4 Emergency telephone number SAFETY DATA SHEET
Related documents
METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY …
asphalt.csir.co.zaThe maximum dry density and optimum moisture content, as defined below, is determined by establishing the moisture-density relationship of the material when prepared and compacted at the Modified AASHTO compaction effort at different moisture contents. Definition Maximum density: The maximum density of a material for a specific compactive effort
Content, Maximum, Density, Optimum, Moisture, Maximum dry, Maximum dry density and optimum moisture content, Maximum density
Soil Density - Standard vs Modified Proctor
www.mrkeystone.netStandard Proctor density except for fine grained soils (ie: clay) where the difference may be significantly larger. ∗ Modified Proctor testing typically requires a lower optimum moisture content for achieving maximum density which is desirable for Keystone retaining wall construction and performance especially with silts and silty soils.
Maximum, Density, Optimum, Moisture, Maximum density, Optimum moisture
Food Plots for White-tailed Deer - Texas A&M University
wildlife.tamu.eduPlants adapted to hot, dry conditions, and intensive farming are essential for producing forage during summer in semiarid areas (Table 2). Moisture management techniques used in dry-land farming such as deep tillage and weed control are necessary for producing food plots in semiarid areas. For warm-season crops such as lablab or cow-
Food, Details, Deer, White, Plot, Moisture, Food plots for white tailed deer
IS 2720-8 (1983): Methods of test for soils, Part 8 ...
law.resource.orgNov 28, 1983 · Determination of water content-dry density relation using heavy compaction [CED 43: Soil and Foundation Engineering] IS : 2720 (Part 8)-l 983 ... maximum density is not as great as can be achieved readily in ... field compaction of soil fill is possible because the optimum moisture content and the density which should be obtained are known by ...
Maximum, Density, Optimum, Moisture, Dry density, Maximum density, Optimum moisture
Exercise 8: Soil Compaction
sites.psu.educurve plots above the zero-air-voids curve. The results obtained are 1.86g/cm^3 for the maximum dry density and 13.6% for the optimum moisture content (Figure 1). Based on the theory, there is a critical point where the soil has maximum dry density. Increasing or decreasing the moisture content from OMC would result in lower dry density.
Maximum, Density, Optimum, Moisture, Dry density, Maximum dry density, Optimum moisture
Part 4 COMPACTION TESTING
web.mst.eduAverage maximum dry unit weight and optimum moisture content achieved by standard Proctor Tests (ASTM D698) with plastic limit (PL) and liquid limit (LL). This is a key figure to consult when compacting expansive clay soils. Taken from “Factors Influencing Compaction” (1962), HRB Report 319.
Maximum, Optimum, Compaction, Moisture, Maximum dry, And optimum moisture
Soil Cement Stabilization - Mix Design, Control and ...
www.ecslimited.commolding of cylinders for compressive strength testing; compacted to 97% maximum dry density having cement contents of 4%, 5%, and 6%. Average maximum dry density and optimum moisture content were within 127 pcf and 5.6%, respectively. Density results are depicted within Figure 1. 114 116 118 120 122 124 126 128 130 0 2 4 6 8 10 12 14 Moisture ...
Maximum, Density, Optimum, Moisture, Maximum dry density, Maximum dry density and optimum moisture
GEOTECHNICAL ENGINEERING LAB MANUAL
www.iare.ac.inDetermination of Optimum moisture content and maximum dry density of soil by Proctor Test 46 California Bearing Ration Test 49 Consolidation Test 54 11 Determination of Unconfined Compressive Strength of the Cohesive soil 68 12 Tri-axial compression Test 5 13 Determination of Shear Strength Parameters of soil by Direct Shear Test 70 14
Manual, Engineering, Maximum, Density, Optimum, Moisture, Geotechnical, Maximum dry density, Optimum moisture, Geotechnical engineering lab manual
Technical Data Sheet
www.jotun.comSurface (touch) dry Walk-on-dry 2 h1 h30 min 14 h6.5 h3 h 14 d7 d3 d Substrate temperature 10 °C23 °C40 °C Dried/cured for service Dry to over coat, minimum 8 h4 h3 h Walk-on-dry: Minimum time before the coating can tolerate normal foot traffic without permanent marks, imprints or other physical damage.
FIELD MOISTURE AND DENSITY TESTING WITH THE …
www.virginiadot.orgJun 22, 2015 · proctor or laboratory proctor. The nuclear density is compared to the maximum dry density to calculate the percent density and the moisture content from the nuclear gauge is compared to the optimum moisture limits. PRETEST WARM‐UP PROCEDURES FOR THE 3440 NUCLEAR GAUGE
Maximum, Density, Optimum, Moisture, Maximum dry density, Optimum moisture