Transcription of c Georgia Department of Transportation
1 C Georgia Department of Transportation Preface The text included in Specification Sections 148, 149, and 151 through 940 is written in the imperative mood (sentences often begin with commands). All commands and references in, or in connection with, these Specifications (including all text, related documents, electronic media, graphics, or photographs). are written to imply Contractor responsibility for action unless otherwise specified. Text placed in text boxes within a Specification does not imply any greater significance than any other text in the Specification. The Specifications contain dual units of measurement The United States Standard Measure (English units) and the International System of Units (SI or metric units). The English units are expressed first with the SI (metric) units following in parentheses. The measurements expressed in the two systems of units are not necessarily equal.
2 In most cases the measurement in SI units is a hard conversion of the English measurement. That is, the SI (metric) unit is a rounded, rationalized SI measurement that is easy to work with and remember. The Proposal will designate whether the Project was designed and is to be constructed in either English units (English project) or SI units (metric project). The dimensions, measurements, and requirements stated in the system of units designated in the Proposal are the applicable Specification requirements for the Contract. All Contractor submittals shall be prepared in the designated system of units. Pay Item quantities will be measured in the designated system of units. Georgia Department of Transportation No. 2 Capitol Square Atlanta, Georgia 30334. GDOT website: General Information Phone (404) 656-5267. 24-Hour Emergency Phone (404) 635-6800. (800) 635-8287. iii iv Table of Contents Section Title Page GENERAL PROVISIONS.
3 Section 101 Definitions and 1. Section 102 Bidding Requirements and Conditions .. 8. Section 103 Award and Execution of 12. Section 104 Scope of Work .. 14. Section 105 Control of 19. Section 106 Control of 26. Section 107 Legal Regulations and Responsibility to the Public .. 32. Section 108 Prosecution and Progress .. 42. Section 109 Measurement and Payment .. 49. Section 148 Pilot Vehicles .. 59. Section 149 Construction 59. Section 150 Traffic Control .. 63. AUXILIARY ITEMS. Section 151 63. Section 152 Field Laboratory 64. Section 153 Field Engineer's 68. Section 155 Insect 73. Section 157 Survey 74. Section 158 Training Program .. 77. CONSTRUCTION EROSION CONTROL. Section 160 Reclamation of Material Pits and Waste Areas .. 80. Section 161 Control of Soil Erosion and Sedimentation .. 86. Section 162 Erosion Control Check Dams .. 86. Section 163 Miscellaneous Erosion Control 88.
4 Section 165 Maintenance of Temporary Erosion And Sedimentation Control Devices .. 94. Section 166 Restoration or Alteration of Lakes and Ponds .. 95. Section 167 Water Quality 96. Section 170 Silt Retention Barrier .. 96. Section 171 Silt Fence .. 98. EARTHWORK. Section 201 Clearing and Grubbing Right of 101. Section 202 Random Clearing and Grubbing .. 106. Section 204 Channel Excavation .. 107. Section 205 Roadway Excavation .. 109. Section 206 Borrow Excavation .. 114. Section 207 Excavation and Backfill for Minor Structures .. 117. Section 208 120. Section 209 Subgrade 127. Section 210 Grading 131. v Section 211 Bridge Excavation and Backfill .. 133. Section 212 Granular Embankment .. 136. Section 214 Mitigation Site 138. Section 215 Removal of Solid Waste .. 138. Section 216 Unpaved Shoulders .. 141. Section 217 Removal of Underground Storage Tanks .. 145. Section 218 Blanket for Fill Slopes.
5 148. Section 219 Crushed Aggregate Subbase .. 149. Section 221 Special Subgrade Compaction and Test Rolling .. 149. BASES AND SUBBASES. Section 222 Aggregate Drainage Courses .. 152. Section 225 Soil-Lime 154. Section 230 Lump Sum Construction .. 163. Section 231 Miscellaneous Construction, Unpaved Roads and 163. Section 232 Railroad Construction .. 163. Section 233 Haul 163. Section 300 General Specifications for Base and Subbase 165. Section 301 Soil-Cement 173. Section 302 Sand-Bituminous Stabilized Base Course .. 182. Section 303 Topsoil, Sand-Clay, or Chert 188. Section 304 Soil Aggregate 193. Section 305 Cement Stabilized Soil Aggregate Construction .. 197. Section 307 Impermeable Membrane for Subgrades, Basins, Ditches, and Canals .. 198. Section 310 Graded Aggregate Construction .. 199. Section 311 Crushed Stone Base .. 203. Section 316 Cement Stabilized Graded Aggregate Construction.
6 203. Section 317 Reconstructed Base 204. Section 318 Selected Material Surface 207. Section 319 Lime-Fly Ash Soil 210. Section 325 Stabilized Base Material for 210. Section 326 Portland Cement Concrete 212. Section 327 Mining, Crushing, and Stockpiling 217. Section 328 Foamed Asphalt Stabilized Base Course .. 217. PAVEMENTS. Section 400 Hot Mix Asphaltic Concrete Construction .. 217. Section 401 Cold Mix for Patching .. 247. Section 402 Hot Mix Recycled Asphaltic Concrete .. 249. Section 403 Hot In-Place Recycled Asphaltic 253. Section 405 Hot Asphalt-Vulcanized Rubber Seal Treatment .. 258. Section 406 Coal Tar Emulsion Seal 261. Section 407 Asphalt-Rubber Joint and Crack Seal .. 262. Section 408 Joint and Crack Cleaning and Seal .. 265. Section 411 Asphaltic Concrete Pavement, Partial Removal .. 265. Section 412 Bituminous Prime .. 267. Section 413 Bituminous Tack Coat.
7 270. vi Section 414 Hot Asphalt Rubber Seal Treatment for Stress Relieving 272. Section 424 Bituminous Surface Treatment .. 272. Section 427 Emulsified Asphalt Slurry 280. Section 428 Micro Surfacing .. 286. Section 429 Rumble 293. Section 430 Portland Cement Concrete Pavement .. 294. Section 431 Grind Concrete Pavement .. 310. Section 432 Mill Asphaltic Concrete Pavement .. 313. Section 433 Reinforced Concrete Approach 315. Section 434 Asphalt Paved Ditches .. 317. Section 435 Rapid Setting Cement Concrete End Dams and Patches .. 320. Section 436 Asphaltic Concrete 324. Section 437 Granite 326. Section 438 Precast Concrete Header Curb .. 327. Section 439 Portland Cement Concrete Pavement (Special).. 329. Section 440 Plain Portland Cement Concrete 341. Section 441 Miscellaneous Concrete .. 346. Section 443 Elastomeric Profile Bridge Joint Seals .. 353. Section 444 Sawed Joints in Existing 353.
8 Section 445 Waterproofing Pavement Joints and Cracks .. 354. Section 446 Placement of Pavement Reinforcement 356. Section 447 Modular Expansion 359. Section 448 Portland Cement Concrete End Dams and Patches .. 359. Section 449 Bridge Deck Joint Seals .. 359. Section 450 Pressure Grouting Portland Cement Concrete Pavement .. 367. Section 451 Patching Portland Cement Concrete Pavement (Spall Repair).. 373. Section 452 Full Depth Slab Replacement .. 376. Section 453 Portland Cement Concrete Whitetopping .. 380. Section 455 Filter Fabric for Embankment Stabilization .. 380. Section 456 Indentation Rumble Strips .. 381. Section 457 Geogrid 383. Section 461 Sealing Roadway and Bridge Joints and 383. BRIDGES. Section 500 Concrete 388. Section 501 Steel Structures .. 428. Section 502 Timber 452. Section 504 Twenty-Four Hour Accelerated Strength Concrete .. 457. Section 505 Corrugated Steel Bridge 461.
9 Section 506 Expanded Mortar .. 462. Section 507 Prestressed Concrete Bridge Members .. 464. Section 508 Asphalt Plank Bridge Floor .. 469. Section 509 Prestressing Concrete by Post 471. Section 510 Protective 487. Section 511 Reinforcement 489. Section 512 Shear Connectors .. 501. Section 513 Precast Reinforced Concrete Box Culverts Barrel Sections and End Sections .. 504. Section 514 Epoxy Coated Steel Reinforcement .. 509. vii Section 515 Handrail-Ferrous Metal and 512. Section 516 Aluminum Handrail .. 515. Section 517 Protective Concrete Collar for Existing Columns .. 517. Section 518 Raise Existing Bridge .. 517. Section 519 Concrete Bridge Deck 517. Section 520 Piling .. 517. Section 522 539. Section 523 Dynamic Testing of Pile .. 540. Section 524 Drilled Caisson 540. Section 525 540. Section 528 Epoxy Pressure Injection of Concrete Cracks .. 543. Section 529 Navigation Lighting.
10 545. Section 530 Waterproofing Fabrics .. 550. Section 531 Dampproofing .. 552. Section 533 Bridge Deck Waterproofing Membrane .. 554. Section 534 Pedestrian Overpass Bridge .. 557. Section 535 Painting Structures .. 557. Section 537 Cattle 574. Section 538 Post-tensioned Prestressed Concrete 574. Section 540 Removal of Existing 574. Section 541 Detour Bridges .. 577. Section 542 Contractor Proposed Alternate to Reinforced Concrete Deck Girder .. 579. Section 543 Bridge Complete .. 584. MINOR DRAINAGE STRUCTURES. Section 544 Deck Drain System .. 586. Section 547 Pile Encasement .. 587. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe .. 592. Section 551 Pile Protection in Earth 596. Section 555 Tunnel 599. Section 560 Structural Plate Pipe, Pipe-Arch and Arch 603. Section 561 Renovating Existing 605. Section 570 Minor Drainage Structures for Detours.