Starter Strip
Found 9 free book(s)CertainTeed Shingle Applicator’s Manual Grand Manor and ...
www.certainteed.comthe first starter strip and apply at the lower left corner of the roof. This 311⁄2" starter strip should overhang the rakes and eaves 1⁄2" when drip edge is used or 3⁄4 when no drip edge is used. Continue with full 36 lengths of starter strips all along the eaves "(Figure 19-8).
HardieShingle Installation Inst HZ10 1 - James Hardie Pros
www.jameshardiepros.com4) Set the bottom of your 1 ¼” starter strip at that line 5) Place your 8 ¼” Starter Course -bottom level with the bottom of the starter strip 6) Set your first row of Shingle - starting the first piece at the vertical line left of center (If you are using staggered edged shingles Trim down the first row to the shortest shingle length)
AZEK Trim & Moulding Install Guide - AZEK Exteriors
azekexteriors.com2” tapered starter strip/nailing ˜ange height • 3⁄ 8” thick starter strip/nailing ˜ange (at its thickest point) Fasten trimboard according to standard AZEK Trim guidelines. Installation Guidelines for AZEK® Trim and Moulding
Here’s Your GAF Shingle & Accessory Limited Warranty
apps.gaf.cominstructions. This limited warranty does not apply to starter strip shingles. GAF warrants to you that your GAF shingles or ridge cap shingles will not fail to seal, blow off, or sustain damage from winds (including gusts) up to the applicable wind speed listed on the reverse after your shingles or ridge cap shingles should have sealed but
Golden Pledge Limited Warranty - GAF
www.gaf.comStarter Strip Shingles, and a GAF Roof Deck Protection Product, plus your choice of either a GAF Leak Barrier Product or GAF Attic Ventilation Product, and your LayerLock-labeled shin-gles being fastened and installed strictly in accordance with GAF’s application instructions.
A Guide To Footings & Foundations - All Day Fencing
www.alldayfencing.com.auThe footing should contain reinforcement steel and starter bars. The starter bars should protrude out of the concrete at spacings roughly 1m or equal to the holes in the blocks. The bottom of the ‘L’ is to sit under the load to pull the wall against the lateral forces. Strip Footings
ELECTRICAL SYMBOLS LEGEND ABBREVIATIONS LEGEND
www.bidnet.comSTRIP FIXTURE IN-GRADE LIGHT FIXTURE SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown) WALL MOUNT LIGHT FIXTURE CEILING LIGHT FIXTURE ... MAGNETIC STARTER (BY x/C U.O.N.) DISCONNECT SWITCH (fuse size shown) TRANSFORMER CONTROL xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt …
Lab 9: Bacterial Transformation & Spectrophotometry, Part ...
laney.edu2. Cut a strip of white filter paper to fit into a glass spec cuvette. Then, insert it into the tube. Gently, place the cuvette in the sample holder so the inside of the fold faces the light source (see Figure 9.1). 3. Set the mode to “transmittance.” Leave the sample holder open and cup your hands around the opening. Look
STIHL 029, 039 (1127) - Sawzilla Parts
sawzillaparts.com16 1121 648 6610 4 Bumper strip 17 1125 656 1501 1 Guard 18 0000 955 0801 2 Collar nut M8 19 1127 148 1200 3 Screw 20 1127 149 0650 1 Exhaust gasket ) 21 21 9331 630 0120 3 Conical spring washer 5 22 1127 140 0601 1 Muffler Standard ) 28 23 1127 140 0605 1 Muffler AUS, CDN ) 26, 27 24 1127 140 0606 1 Muffler USA ) 26, 27