New Lectures5&6&7 PM Scheduling IP ENCE603 ext instructor
home.ubalt.eduNetwork Analysis • Network Scheduling: • Main purpose of CPM is to determine the “critical path” • Critical path determines the minimum completion time for a project • Use forward pass and backward pass routines to analyze the project network • Network Control: • Monitor progress of a project on the basis of the network schedule
Lectures notes On Production and Operation Management
www.vssut.ac.inLecture 26 Project management, network scheduling Lecture 27 PERT with problems Lecture 28 Problems Lecture 29 Critical path method with problems Lecture 30 Problems Lecture 31 Resource levelling Lecture 32 Basic concepts of CAD, CAM, FMS Lecture 33 CIM, JIT, ISO 9000 Lecture 34 Quality circle, Kaizen, Kanbans