Example: air traffic controller
Search results with tag "Section 5 storm drains"
SECTION 5 – STORM DRAINS - Round Rock, Texas
www.roundrocktexas.govThe design storm shall be the 25 year storm with provisions made for the 100 year storm as noted in Section 3 of this Manual. 5.2.0 DESIGN GUIDELINES The following rules are to be observed in the design of storm drain system components to be located in public right-of-way or public drainage easements in order to promote proper operation and to ...