STANDARD CONSTRUCTION SPECIFICATIONS FOR …
www.muni.orgPage 4 Standard Construction Specifications Division 20 - Earthwork Revised 11/08 62.4 Corrected Lab Density = A 62.4(B) C + r D A = Percent by weight of original material retained on the 3/4-inch sieve, expressed as a decimal. B = Percent by weight of original material passing the 3/4-inch sieve, expressed as a decimal.
STANDARD CONSTRUCTION SPECIFICATIONS FOR …
www.muni.orgPage 4 Standard Construction Specifications Division 40 – Asphalt Surfacing Revised 11/08 SECTION 40.02 SEAL COAT Article 2.1 Description The Work under this Section consists of the performance of all Work required for the construction of a seal coat of asphalt cement and cover aggregate on RAP, strip-paved, and gravel surfaces.
STANDARD CONSTRUCTION SPECIFICATIONS FOR …
www.muni.orgPage 4 Standard Construction Specifications Division 40 – Asphalt Surfacing Revised 11/08 SECTION 40.02 SEAL COAT Article 2.1 Description