Search results with tag "Construction activities"
Fall Protection for Construction Activities
osha.oregon.govFall protection for construction activities How Oregon construction workers fall Table 1 shows that falls from ladders account for nearly half of all disabling falls. Causes may include selecting the wrong type of ladder, using a damaged ladder, …
Chapter 15 Construction Survey Procedures
www.wsdot.wa.govOct 18, 2004 · Construction Survey Procedures 15-02.1 Clearing and Grubbing After Aesthetic and Environmental concerns are addressed, Clearing and Grubbing stakes are set to mark the limits of disposal of all unwanted material from the surface (clearing) and underground (grubbing). This prepares the project for other staking and construction activities.
COVID-19 Guidance for Construction Workers
www.osha.govnecessary to protect workers from other job hazards associated with construction activities. Provide and ensure workers use the supplies necessary for good hygiene practices. If workers do not have immediate access to soap and water, use alcohol-based hand sanitizers that contain at least 60 percent ethanol or 70% isopropanol.
Training Report on 220 to 132kV Substation
www.123seminarsonly.como About the substation ü Construction ... because water is required for various construction activities (especially civil works), earthing and for drinking purposes etc. v) The sub -station site should be as near to the town / city but ... /termination of high voltage overhead transmission lines. 4.Equipment in a 220KV Sub-Station :-
Fall Protection in Construction
www.osha.govfor Certain Construction Activities Leading Edges – 29 CFR 1926.501(b)(2) Each worker constructing a leading edge 6 feet or more above a lower level must be protected by guardrail systems, safety net systems, or personal fall arrest systems. 29 CFR 1926.501(b)(2)(i). Exception: When the employer can demonstrate that it is
17 Construction environmental management plan …
hayle.netHayle Harbour Revision 01 Environmental Statement November 2007 Copyright © Buro Happold Limited Section17-5 Buro Happold • monitor construction activities to ensure that identified and appropriate control measures are effective
PERMIT SUMMARY SHEET FOR GENERAL (PAG-02) OR …
www.lehighconservation.orginstructions or stormwater discharges associated with construction activities . ’ “”’ ’