Example: confidence

Search results with tag "Vapor recovery"

Enforcement Discretion for Stage II Vapor Recovery Systems

Enforcement Discretion for Stage II Vapor Recovery Systems

www.dec.ny.gov

(9) conduct a passing CARB Vapor Recovery Test Procedure TP-201.3 – Determination of 2-inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities to ensure the vapor tightness of the system; and

  Tests, Procedures, Recovery, Vapor, Vapor recovery, Vapor recovery test procedure

Testing Procedures Guidance Manual for Stage II Vapor Recovery

Testing Procedures Guidance Manual for Stage II Vapor Recovery

www.portcompliance.org

2.1 Condition of the Vapor Recovery System - The vapor recovery system must be proven vapor tight with the Leak Test (see page 10), prior to conducting this test.

  Tests, Stage, Recovery, Vapor, Vapor recovery, Stage ii vapor recovery

In-Station Diagnostics: Vapor Recovery Monitoring Systems

In-Station Diagnostics: Vapor Recovery Monitoring Systems

www.ourair.org

Vapor Recovery Monitoring Systems Californria AAirr Resourcese Boardr P.O Box x2815, Sacramento, CA 99588122 ... INCON Vapor Recovery Monitoring Oper-ability Test Procedure 1. Inspection Points ... ISD Vapor Flow Meter Operability Test Procedure 1. Inspection Points - The following components are authorized:

  System, Tests, Procedures, Monitoring, Recovery, Vapor, Test procedures, Vapor recovery, Vapor recovery monitoring systems

Certification Procedure for Vapor Recovery Systems at

Certification Procedure for Vapor Recovery Systems at

listserv.arb.ca.gov

e-California Environmental Protection Agency Air Resources Board Vapor Recovery Certification Procedure CP-201 Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities

  Procedures, Recovery, Vapor, Vapor recovery

REGULATION 6.40 Standards of Performance for Gasoline ...

REGULATION 6.40 Standards of Performance for Gasoline ...

louisvilleky.gov

The test procedure is found in TP-201.5 in the Guidance. 1.2 "Aspirator assist system" means a vapor recovery system that uses a vacuum created by a ... 1.32 "Stage II vapor recovery and control system" or “Stage II system” means a vapor-

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

AP-42 Section 5.2: Transportation And Marketing Of ...

AP-42 Section 5.2: Transportation And Marketing Of ...

www3.epa.gov

Vapor recovery efficiency is 95 percent Vapor collection efficiency is 98.7 percent (NSPS-level annual leak test) Loading loss equation - where: S = saturation factor (see Table 5.2-1) - 1.00 P = true vapor pressure of gasoline = 6.6 psia M = molecular weight of gasoline vapors = 66 T = temperature of gasoline = 540°R

  Tests, Loading, Recovery, Vapor, Vapor recovery

Executive Order VR-202-U Assist Phase II EVR System ...

Executive Order VR-202-U Assist Phase II EVR System ...

vsthose.com

for vapor recovery systems at gasoline dispensing facilities. Testing the ISD equipment in accordance with this procedure will verify the equipment’s operability for Vapor Containment Monitoring and Vapor Collection Monitoring.

  Procedures, Recovery, Vapor, Vapor recovery

Test Procedure: 2002-07-03 TP-201.6C Compliance ...

Test Procedure: 2002-07-03 TP-201.6C Compliance ...

avaqmd.ca.gov

Vapor Recovery Test Procedure TP-201.6C Compliance Determination of Liquid Removal Rate A set of definitions common to all certification and test procedures is in: D-200 Definitions for Vapor Recovery Procedures For the purpose of this procedure, the term "CARB" refers to the California Air Resources Board, and

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery, Vapor recovery test procedure

AIR RESOURCES BOARD

AIR RESOURCES BOARD

listserv.arb.ca.gov

vapor recovery systems with emission standards in its “Certification and Test Procedures for Vapor Recovery Systems,” TP-205.1 and TP-205.2, respectively, (the Test Procedures”) adopted April 12, 1996, and as amended March 17, 1999,

  Tests, Board, Resource, Recovery, Vapor, Air resources board, Vapor recovery

State of California filling of underground gasoline ...

State of California filling of underground gasoline ...

listserv.arb.ca.gov

the Certification Procedure, and results in a vapor recovery system which is at least 95 percent effective for attended and/or self-service use at gasoline service stations when used in conjunction with a ARB-certified Phase I vapor recovery system.

  Procedures, Recovery, Vapor, Vapor recovery

2730-BK-DEP3143 Self-Inspection Handbook

2730-BK-DEP3143 Self-Inspection Handbook

www.dnrec.delaware.gov

Nozzle Inspection Procedure - This procedure checks to see if there is an air leak in the vapor recovery system. THIS TEST IS ONLY TO BE USED AS A DIAGNOSTIC TOOL, AND DOES NOT REPLACE OTHER TESTING REQUIREMENTS. Use a bag large enough to enclose the entire vapor recovery nozzle. The bag should

  Tests, Procedures, Recovery, Vapor, Vapor recovery

CP - 201 Certification Procedure for Vapor Recovery ...

CP - 201 Certification Procedure for Vapor Recovery ...

ww2.arb.ca.gov

Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities A set of definitions common to all Certification and Test Procedures are in:

  Tests, Procedures, Recovery, Vapor, Vapor recovery

TEST REPORT for the ARID TECHNOLOGIES VAPOR RECOVERY UNIT ...

TEST REPORT for the ARID TECHNOLOGIES VAPOR RECOVERY UNIT ...

www.aridtech.com

The vapor recovery unit hydrocarbon emission rate will be determined from processor outlet hydrocarbon concentration and outlet volume. The test methods MTS will use are specified in

  Tests, Unit, Technologies, Recovery, Vapor, Arid, Vapor recovery, Arid technologies vapor recovery unit

Test Method: 1996-04-12 TP-201.5 Determination (by Volume ...

Test Method: 1996-04-12 TP-201.5 Determination (by Volume ...

agriculture.az.gov

vapor recovery system. This test procedure is particularly well suited to dispensing facility vapor recovery systems which use bootless nozzles with circumferential holes near the front of their spouts; but it may be adapted for other systems.

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

Section 5-253.5 - Stage I Vapor Recovery Controls at ...

Section 5-253.5 - Stage I Vapor Recovery Controls at ...

www.epa.gov

Test Procedure TP-201~3 ­ Determination of 2-Inch WC static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities, adopted April 12, 1996 and amended March 17, 1999;

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

§63.11124 40 CFR Ch. I (7–1–12 Edition)

§63.11124 40 CFR Ch. I (7–1–12 Edition)

www.gpo.gov

Vapor Recovery Test Procedure TP– 201.3,—Determination of 2-Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Fa-cilities, adopted April 12, 1996, and amended March 17, 1999 (incorporated by reference, see §63.14). (ii) Use alternative test methods and

  Tests, Procedures, Recovery, Vapor, Vapor recovery, Vapor recovery test procedure

CP-201, Procedure for Vapor Recovery Systems at Gasoline ...

CP-201, Procedure for Vapor Recovery Systems at Gasoline ...

www.husky.com

the requirements set forth in the Certification Procedure, and results in a vapor recovery system which is at least 98.0 percent efficient as tested in accordance with test procedure TP-201.1, Volumetric Efficiency for Phase I Systems (October 8, 2003);

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

www.portcompliance.org

www.portcompliance.org

www.portcompliance.org

Gasoline Transport Vehicles Self-Inspection Handbook For Vapor Recovery Systems on Transport Vehicles How to Comply with 'fransport Vehicle Vapor Recovery Regulations

  System, Recovery, Vapor, Vapor recovery systems, Vapor recovery

ATTACHMENT A: VAPOR RECOVERY TESTS FOR PHASE I EVR SYSTEMS ...

ATTACHMENT A: VAPOR RECOVERY TESTS FOR PHASE I EVR SYSTEMS ...

www.sandiegocounty.gov

ATTACHMENT A: VAPOR RECOVERY TESTS FOR PHASE I EVR SYSTEMS, PHASE II PRE-EVR SYSTEMS AND ... The CARB Test Procedure TP-201.3 (most recent version) shall be conducted between sundown and a half hour after sunrise to minimize interface from solar effects and barometric pressure changes.

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

Smith Meter AccuLoad IV

Smith Meter AccuLoad IV

info.smithmeter.com

The vapor recovery arm type supports delivering a single product while monitoring the amount of vapor recovered. In order to utilize this feature, a loading arm type must be programmed as “Straight with VRS”. Two meters are required for this application to determine the amount of vapor recovered while loading light density products. The ...

  Monitoring, Recovery, Vapor, Vapor recovery, Accuload

FIRE SAFETY REQUIREMENTS FOR PETROLEUM SERVICE …

FIRE SAFETY REQUIREMENTS FOR PETROLEUM SERVICE …

www.scdf.gov.sg

The filling connection to a storage tank, which is filled from a tank vehicle, shall incorporate a vapor-tight connection. A cap or cover with lock shall be provided for the filling point. Means shall be provided to prevent accumulation or abnormal discharge of vapor during refilling by having a vapor recovery system. 2.13 Location of Filling Point

  Storage, Recovery, Vapor, Vapor recovery

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR ...

State of California AIR RESOURCES BOARD EXECUTIVE ORDER VR ...

www.vsthose.com

39600, 39601, 39607, and 41954, test procedures for determining the compliance of Phase II vapor recovery systems with emission standards; WHEREAS, Vapor Systems Technologies (VST), Inc. requested an amendment of the

  Tests, Recovery, Vapor, Vapor recovery

LeakMaster - The Smoke Machine

LeakMaster - The Smoke Machine

www.thesmokemachine.com

2 The fuel vapor recovery system is the most neglected part of a vehicle’s emission system, according to the Environmental Protection Agency (EPA).

  Recovery, Vapor, Leakmaster, Vapor recovery

Monthly Walkthrough & Inspection Checklist

Monthly Walkthrough & Inspection Checklist

dnr.wi.gov

facilities that choose to retain Stage II vapor recovery systems (monthly inspections of Stage II equipment are not required but recommended - see page 66). To document walkthroughs, record the date of each monthly inspection under the month name. For each device/system inspected, mark whether it was working

  Checklist, Inspection, Monthly, Recovery, Vapor, Walkthrough, Vapor recovery, Monthly walkthrough amp inspection checklist

SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT

SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT

agriculture.az.gov

san diego county air pollution control district test procedure tp-96-1 third revision-3/1/96 static pressure leak test procedure volitile fuel vapor recovery installations

  Tests, County, Control, Procedures, District, Pollution, Recovery, Diego, Vapor, Test procedures, Vapor recovery, Diego county air pollution control district, Diego county air pollution control district test procedure

Gasoline Cargo Tank Test Procedures Washington State ...

Gasoline Cargo Tank Test Procedures Washington State ...

fortress.wa.gov

Test Procedures Washington State Department of Ecology September 1999 Publication Number 03-02-017 ... 3.7 Test Cap for Vapor Recovery Hose. This cap shall have a tap for manometer connection and ... Test Procedure 5.1 Preparations.

  Department, States, Tests, Procedures, Washington, Recovery, Vapor, Test procedures, Vapor recovery, Test procedures washington state department of

CP - 207 Certification Procedure for Enhanced Conventional ...

CP - 207 Certification Procedure for Enhanced Conventional ...

ww2.arb.ca.gov

Vapor Recovery Certification Procedure CP - 207 Certification Procedure for Enhanced Conventional (ECO) Nozzles and Low Permeation Conventional Hoses for Use at

  Procedures, Recovery, Vapor, Vapor recovery

State of California AIR RESOURCES BOARD EMCO Wheaton ...

State of California AIR RESOURCES BOARD EMCO Wheaton ...

www.husky.com

set forth in the Certification Procedure and results in a vapor recovery system which is at least 98.0 percent efficient as tested pursuant to the test procedure TP-201.1 , Volumetric Efficiency for Phase I Systems (October 8, 2003);

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

Leading the Way in Above Ground Storage Tank Equipment ...

Leading the Way in Above Ground Storage Tank Equipment ...

www.steeltank.com

Test Procedure TP-206 Procedure to determine compliance with AST EVR system ... Phase I vapor recovery systems are mandated to meet or exceed a minimum 98% efficiency rating. The certification required OPW to pass a strenuous 24/7 test protocol over a 14-month evaluation period.

  Tests, Procedures, Recovery, Vapor, Test procedures, Vapor recovery

LeakTamer Plus Evap - http://www.thesmokemachine.com

LeakTamer Plus Evap - http://www.thesmokemachine.com

www.thesmokemachine.com

2 The fuel vapor recovery system is the most neglected part of a vehicle’s emission system, according to the Environmental Protection Agency (EPA).

  Plus, Recovery, Vapor, Leaktamer plus evap, Leaktamer, Evap, Vapor recovery

Vapor Recovery Test Procedure - Homepage | California Air ...

Vapor Recovery Test Procedure - Homepage | California Air ...

www.arb.ca.gov

Vapor Recovery Test Procedure TP-201.1 VOLUMETRIC EFFICIENCY OF PHASE I SYSTEMS ... 6.6 Record, on the Phase I Vapor Recovery Data Sheet, the barometric pressure. 6.7 Connect the Cargo Tank Vapor Assembly to the vapor coupler on the gasoline cargo tank. If the cargo tank vapor coupler is equipped with a poppet, use a

  Tests, Procedures, Recovery, Vapor, Vapor recovery, Vapor recovery test procedure

Similar queries