Example: quiz answers

Search results with tag "Competent person"

Parts 46 and 48 - Mine Safety and Health Administration

Parts 46 and 48 - Mine Safety and Health Administration

www.msha.gov

"Competent Person" – Part 46 does not require that "competent persons" be approved by MSHA. A "competent person," is a person who is designated by the production-operator or independent contractor who has the ability, training, knowledge, or experience to provide training to miners in his or her area of expertise.

  Administration, Health, Safety, Mines, Persons, Competent, Mine safety and health administration, Competent person

Trenching and Excavation Safety - Occupational Safety and ...

Trenching and Excavation Safety - Occupational Safety and ...

www.osha.gov

Competent Person OSHA standards require, before any worker entry, that employers have a competent person inspect trenches daily and as conditions change to ensure elimination of excavation hazards. A competent person is an individual who is capable of identifying existing and predictable hazards or working conditions that are hazardous,

  Safety, Persons, Competent, Trenching, Excavations, Competent person, Trenching and excavation safety

Thorough examination and testing of lifts - HSE

Thorough examination and testing of lifts - HSE

www.hse.gov.uk

The competent person is legally required to send you a written and signed report of the thorough examination as soon as practicable. This should normally be within 28 days, but if there is a serious defect which needs to be addressed you should expect to receive the report much sooner.

  Persons, Competent, Competent person

Ladder Safety: Reducing Falls in Construction: Safe Use of ...

Ladder Safety: Reducing Falls in Construction: Safe Use of ...

www.osha.gov

• A competent person must visually inspect job-made ladders for defects on a periodic basis and after any occurrence that could affect their safe use. • Defects to look for include: structural damage, broken/split side rails (front and back), missing cleats/steps, and parts/labels painted over. • Ladders should be free of oil, grease and ...

  Persons, Competent, Competent person

Guidance on Lifting Operations in Construction When Using ...

Guidance on Lifting Operations in Construction When Using ...

www.highwayssafetyhub.com

The competent person (See LOLER ACOP and Guidance para. 220 –223) should first carry out a risk assessment, which will include ensuring that the earth moving machinery is suitable for the task, that adequate lifting accessories are available and the ground conditions are suitable. The lifting accessories, including quick hitches, should be

  Persons, Competent, Loler, Competent person

Calorifier Installation Guide - Kingspan

Calorifier Installation Guide - Kingspan

www.albionwaterheaters.com

333 This product was water tested prior to dispatch. Mechanical joints can loosen in transit, please check on installation. A competent person, in …

  Guide, Installation, Persons, Competent, Competent person, Calorifier installation guide, Calorifier

Similar queries