Search results with tag "First article inspection"
AS9102 First Article Inspection (FAI) Supplier Process Steps
www.psemc.comAS9102 - First Article Inspection (FAI) Supplier Process Steps 1.0 Purpose 1.1 These process steps are intended to assist in complying with the First Article Inspection requirements set forth in AS9102. These are intended for clarification only, not to supersede any requirements set forth in AS9102.
AS9102 First Article Inspection (FAI) Supplier …
www.psemc.comAS9102 - First Article Inspection (FAI) Supplier Process Steps 1.0 Purpose 1.1 These process steps are intended to assist in complying with the First Article Inspection requirements set forth in AS9102.
Raytheon Quality Note Revision - Date 18DX 09/15/21 FIRST ...
qnotes.raytheon.comperform a First Article Inspection (FAI) that conforms to the requirements of AS9102 Revision B, Aerospace First Article Inspection Requirement with the following exceptions: 2.1. For Castings/Forgings, Seller shall perform the FAI on one piece per cavity for product of a die or mold, fully heat treated and inspected to the requirements of the
AS9102 First Article Training
www.gd-ots.comAS9102 First Article Training Supplier Quality Assurance Team ... Submit First Article Inspection package through the ... The acceptance report for the associated functional test should be provided under this section associated with the appropriate line in section 11. 13.
Sheet 1 of 3 First Article Inspection Report Form 1: Part ...
www.captorcorp.comSheet 1 of 3 3. Serial/Lot Number 7. Drawing revision level 11. Supplier Code 18. FAI Report Number 20. Date 22. Date 24. Date First Article Inspection Report
Supplier Quality Assurance Requirements Under AS9100 ...
www.gulfstream.com- 4 - 6.2 The first article inspection report must show evidence of acceptance by the supplier’s quality assurance representative. The first article(s) shall
FIRST ARTICLE INSPECTION (FAI)
www.sirs.co.ukQuality – First Article Inspection Page 1 of 2 Iss 1 Rev 0 June 11 FIRST ARTICLE INSPECTION (FAI) 1.0 The purpose of carrying out an FAI is to give objective evidence that all engineering, design and specification requirements are corr ectly understood, accounted for, verified and recorded. The document is intended to guide how this is achieved.
First Article Inspection (FAI) AS9102
www.lockheedmartin.comQ2A – First Article Inspection (FAI) – AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network. The terms “Item”, “PO”, “Buyer” and “Seller” used herein have the same meaning as “Work”, “Contract”, “Lockheed Martin”
First article inspection report: Approval form - Moog, Inc.
www.moog.comAS9102 Rev A: First Article Inspection Sheet 3 of 6 Form 1: Part Number Accountability 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report Number FAI 5. Part Revision Level 6.