STATEWIDE SUMMER CONSTRUCTION PROJECTS / 2016 . DISTRICT 1 (Northeast Georgia) Mohamed Arafa 678-721-5284. County project Name/ Brief project Description Lane Closure Allowed & Timeframe project Timeframe SR 400 SB allowed between 7:00 pm to 5:30. Intersection Improvements and VDS on SR 400 @ SR am M-Thur. Single lane closures allowed Dawson 9:00 pm Sat. to 9:00 am Sun. Comp: 5/10/17. 53. Widening and Reconstruction on SR 400 Southbound lane closures allowed from 9pm Forsyth From McFarland Road Pkwy Interchange to SR369/ to 5am, M Th; Northbound lane closures Comp: 10/1/18. Brown Bridge Road allowed daily from 9pm to 12pm Lane Closures allowed 9:00 am to 4:00 pm and 7:00 pm to 6:00 am, M F. Forsyth/ Widening and Reconstruction SR 20 @ Chattahoochee Single lane closures allowed 10:00 am to Comp: 5/31/2018. Gwinnett River @ Forsyth Co. Line 4:00 pm and 7:00 pm to 8:00 am, Sat. and Sun Single lane closures allowed weekdays from Widening and Reconstruction on SR 20/Buford Hwy Forsyth 7pm to 6am and from 8pm to 8am on Comp: 5/31/19.

5 | Page External Master- revised May 19, 2016 Includes major impact projects across the state. Does not include ALL construction projects. CR 85/Arkwright Rd performed in close proximity to travel lanes Comp: 5/31/2017

Tags:

  States, 2016, 2017, Project, Construction, Summer, Statewide, Statewide summer construction projects

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of STATEWIDE SUMMER CONSTRUCTION PROJECTS …

1 STATEWIDE SUMMER CONSTRUCTION PROJECTS / 2016 . DISTRICT 1 (Northeast Georgia) Mohamed Arafa 678-721-5284. County project Name/ Brief project Description Lane Closure Allowed & Timeframe project Timeframe SR 400 SB allowed between 7:00 pm to 5:30. Intersection Improvements and VDS on SR 400 @ SR am M-Thur. Single lane closures allowed Dawson 9:00 pm Sat. to 9:00 am Sun. Comp: 5/10/17. 53. Widening and Reconstruction on SR 400 Southbound lane closures allowed from 9pm Forsyth From McFarland Road Pkwy Interchange to SR369/ to 5am, M Th; Northbound lane closures Comp: 10/1/18. Brown Bridge Road allowed daily from 9pm to 12pm Lane Closures allowed 9:00 am to 4:00 pm and 7:00 pm to 6:00 am, M F. Forsyth/ Widening and Reconstruction SR 20 @ Chattahoochee Single lane closures allowed 10:00 am to Comp: 5/31/2018. Gwinnett River @ Forsyth Co. Line 4:00 pm and 7:00 pm to 8:00 am, Sat. and Sun Single lane closures allowed weekdays from Widening and Reconstruction on SR 20/Buford Hwy Forsyth 7pm to 6am and from 8pm to 8am on Comp: 5/31/19.

2 Beg. at Samples Rd. and Ext. to James Burgess Rd. weekends Operational Improvements of I-85 NB from SR 140 to Lane closures allowed between 10 pm to 5am Gwinnett Indian Trail Lilburn Rd Monday to Friday and between 10 pm Friday Comp: 1/22/16. to 6 am on Weekends Resurfacing and Maintenance on SR 13 from Old No lane closures between 6-9 am & 4-8 pm Gwinnett Comp: 9/30/16. Peachtree Rd to SR 20 M-F and 8am-9pm Sat. &Sun. 1 | Page External Master- revised May 19, 2016 . Includes major impact PROJECTS across the state. Does not include ALL CONSTRUCTION PROJECTS . Patching and Milling and plant mix SR 13 from SR 20 No Lane closures between 6-9am & 4-8 pm Gwinnett Comp: 10/31/16. West of Sawnee Ave. M-F and 8am-9pm Sat. & Sun. Single lane closures between 7:00 pm to 6:00. Widening and CONSTRUCTION of SR 20 East of Burnette Gwinnett am Mon. Thur. and between 8pm and 6 am Comp: 6/1/17. Trail to Peachtree Ind. Blvd on Weekends Lane closures allowed 8:00 pm to 5:00. am, Sun.

3 - Thur. and between 8 pm and Gwinnett Express Lanes I-85 N of Old Peachtree to Hamilton Comp: 6/26/18. Mill Rd 9 am on Weekends; limited lane closures allowed during daytime hours Lane closures allowed 9:00 am to 2:30 pm Widening and reconstruction of SR 347/Friendship Rd and 6:00 pm to 6:00 am, Mon. - Thu. and Hall some closures on weekends. Comp: 6/30/16. beginning at I-985/SR 419 and Ext. to SR 211. Milling and Plant Mix Resurfacing, Shoulder Barrow/. Rehabilitation of SR 8 from South of Stanley Court to No lane closures 6-8:30am & 4:30-8 pm M-F Comp: 9/30/16. Gwinnett NE of Barrow County Line No lane closures 6am -8pm m-f and no lane Resurfacing and Mai of SR 10/US78 from Gaines Clarke closures between 3pm Friday -9am Monday Comp: 8/31/16. School Rd to Oglethorpe County Line on UGA home game weekends Single lane closures and flagging operations allowed 9:00 am to 4:00 pm and 7:00 pm to 6:00 am, M F. University of Georgia Home Football Games Widening and Reconstruction and Installation of Lane Closures No lane closures, flagging Oconee Intersection VDS of Mars Hill Rd from Hog Mtn.

4 Rd Comp: 5/26/18. operations, or any other activity will be to SR 8/SR 316 Phase I. allowed that affects traffic between 3:00 pm the Friday before the game until 9:00 am the Monday after the game throughout the project . 2 | Page External Master- revised May 19, 2016 . Includes major impact PROJECTS across the state. Does not include ALL CONSTRUCTION PROJECTS . Lane closures allowed 8:30 am to 4:30 pm Fri. and 7:00 pm Fri. to 6:00 am Mon. Franklin, Widening and Reconstruction of SR 17 from South of SR 17 (Multilane Lane) Single lane closures Comp: 5/31/16. Stephens Franklin Line to North of Scott Rd and 2 bridges allowed 8:30 am to 4:30 pm and 7:00 pm to 6:00 am, Mon. through Thur. Lane closures allowed 8:30 am to 4:30 pm Fri. and 7:00 pm Fri. to 6:00 am Mon. Widening and Reconstruction on SR 17/SR 17 Alt. Stephens Comp: 4/30/16. from Scott Rd to Memorial Drive SR 17 (Multilane Lane) Single lane closures allowed 8:30 am to 4:30 pm and 7:00 pm to 6:00 am, Mon.

5 Through Thur. DISTRICT 2 (East Central Georgia) Kyle Collins 478-553-3361. County project Name/ Brief project Description Lane Closure Allowed & Timeframe project Timeframe An off-site detour in place for up to SR 43 @ Soap Creek E of Lincolnton 18 months. Drivers on SR 43 will use SR. Lincoln 7/31/17. Bridge 220, Chamberlain S Ferry Road, SR 47 and SR 43 connector as detour routes. No lane closures and work allowed between Resurfacing & Maintenance of SR 4/ Deans Bridge 6:30 to 8:30 and 4 to 6 Richmond Road from W of CR 67/Morgan Rd to SR 10 (Gordon Sunday through Saturday. 2/28/17. Highway). No lane closures and work shall be allowed Resurfacing & Maintenance of SR 11 from SR 16/SR. Jasper between 6 to 8 and 3 to 5 83 (Southern Avenue) to Newton County Line 2/28/17. Sunday through Saturday. Bridge Replacement over Little Ohoopee River on Traffic will be maintained with the addition Johnson State Route 171 located North of Kite in Johnson of an on-site detour bridge during 7/31/ 2017 .

6 County CONSTRUCTION . Newton Bridge Replacement over the Yellow River on SR 36 Traffic will use SR 162 and SR 212 as an off- 5/31/18. 3 | Page External Master- revised May 19, 2016 . Includes major impact PROJECTS across the state. Does not include ALL CONSTRUCTION PROJECTS . 14 miles south of Covington Bridge. site detour until the bridge is complete. Local traffic will be allowed along SR 36 up to the CONSTRUCTION zone. No closures between 6:30 to 8:30 Resurfacing and Maintenance of SR 121 from S of CR or from 4 to 6 Sunday thru Richmond TBD. 1503/Tobacco Rd to CR 199/Lumpkin Rd Saturday. Widening of SR 142 from I-20 at Hazelbrand Road to Lane closures allowed weekdays from 6:00. Newton Alcovy Road and includes widening Harland Drive to TBD. am to 8:00 am and 4:00 pm to 7:00 pm. just east of Avenue of Champions. Replace and upgrade existing signage on I-20 Newton, twenty-two locations between Newton and Richmond Work to be completed utilizing shoulder TBD.

7 Richmond counties closures SR 36 @ CR 181/Flat Shoals/Steel Rd and CR. Traffic will be maintained on existing Newton 506/Henderson Mill 8/31/17. roadways during CONSTRUCTION . Realignment of Henderson Mill Road (CR 508). DISTRICT 3 (West Central Georgia) Kimberly Larson 706-646-7532. County project Name/ Brief project Description Lane Closure Allowed & Timeframe project Timeframe I-75 South Metro Express Lanes Weeknight: 9 - 5 northbound only Henry/Clayto Add toll lanes and reversible lanes along I-75 South of Weeknight: 9 - 7 southbound only Comp: 01/ 2017 . n Atlanta at SR155/ McDonough Rd. and ends at Weekends Continuously from Friday at 9. SR138/Stockbridge Highway until Monday morning Coweta/ Replace striping and RPMs on I-85. Fulton/ from N of SR 219 in Troup County to S of SR 92 in Lane closures limited to nighttime only NTP: 3/2/ 2016 . Meriwether/ Fulton County between 8 pm and 7 am Comp: 12/31/ 2016 . Troup No traffic interruptions on I-85 weekdays NTP: 5/5/ 2016 .

8 Coweta New Interchange on I-85 @ CR 103/Poplar Rd from 6am to 9am (northbound) and weekdays Comp: 5/31/2021. from 4pm to 7pm (southbound). Bibb Replace Lighting on I-75 from SR 247 to Minimal lane closures but work will be NTP: 4/1/ 2016 . 4 | Page External Master- revised May 19, 2016 . Includes major impact PROJECTS across the state. Does not include ALL CONSTRUCTION PROJECTS . CR 85/Arkwright Rd performed in close proximity to travel lanes Comp: 5/31/ 2017 . Resurfacing and Maintenance on SR 85 from SR 92 to No traffic interruptions on weekdays from NTP: None Fayette Clayton County Line 7pm to 7am. Comp: 1/31/ 2017 . Resurfacing and Maintenance on SR 81 from SR 20 to Weekday single lane closures from 7pm to NTP: Henry Newton County Line 6am Comp: Resurfacing and Maintenance on SR 16 from SR 42 to Nighttime lane closures between 8 pm and 7 NTP: 4/19/ 2016 . Butts I-75 am Comp: 2/28/ 2017 . Resurfacing and Maintenance on SR 155 from SR 3 to Nighttime lane closures between 8 pm and 7 NTP: Spalding Poplar Road am Comp:2/28/ 2017 .

9 Resurfacing and Maintenance on SR22 Spur from SR. NTP: Muscogee 1 to Reese Road Daily lane closures from 7pm to 6am Comp:2/28/ 2017 . Resurfacing and Maintenance on SR 247 from Houston Lane closures allowed daily from 7 pm 6 NTP: 10/21/2015. Houston Lake Road to SR 247/Watson Blvd am Comp: 7/31/ 2016 . Resurfacing and Maintenance on SR 11/US 129 from Single and double lane closures nightly from NTP: 4/5/ 2016 . Bibb Barnes Ferry Road to point north of SR 247 8 pm to 6 am. Comp: 1/31/ 2017 . NTP: 9/4/2015. Resurfacing and Maintenance on SR 16 beginning east Comp:6/30/ 2016 . Coweta of US 29 / SR 14 and extending to the Spalding County Contractor currently working 24/7, Snell line Work Began: 3/14/ 2016 . DISTRICT 4 (Southwest Georgia) Juanita Birmingham 229-391-5463. County project Name/ Brief project Description Lane Closure Allowed & Timeframe project Timeframe No lane closures from 7 am to 7 pm Resurfacing I-75 from S of CR 204/Southwell Rd in Ramp closures allowed 10 pm to 5 am Completion date Tift & Turner Tift County to S of SR 32 in Turner County Sunday Thursday work schedule 1/31/ 2017 .

10 Daily nighttime lane closures expected Widening & reconstruction on SR 135 from SR. 31/US441 E to SR 32; including Railroad separation Completion date Coffee No lane closures 6-9 am and 3:30-7 pm CONSTRUCTION of bridge over CSX railroad and Iron 5/31/2020. Road 5 | Page External Master- revised May 19, 2016 . Includes major impact PROJECTS across the state. Does not include ALL CONSTRUCTION PROJECTS . Interchange closed, off-site detour; I-75 N &. Interchange reconstruction on I-75 at Exit 66/Brighton S inside lanes closed, expected to reopen Completion date Tift Road June. Occasional nighttime lane closures 11/30/ 2016 . expected I-75 at Exit 13/Old Clyattville Road Old Clyattville Road traffic narrowed to one Completion date Lowndes **Exit to Wild Adventures Theme Park Bridge lane each direction; I-75 South detour when 9/30/ 2016 . bridge spans are removed & replaced Completion date Lanier SR 64 at Five Mile Creek and Ten Mile Creek Bridge Off-site detour 10/31/ 2017 .