02601 - Water Pipe - Juneau

SECTION 02601 Water PIPESTANDARD SPECIFICATION CIVIL ENGINEERINGWATER PIPEPROJECTS AND SUBDIVISION IMPROVEMENTSPage 02601 -1 December 2003 PART 1 DESCRIPTIONA. The WORK under this Section includes providing all labor, materials, tools andequipment necessary for furnishing and installing buried Water pipe and fittings, thrustblocks, tie rods, electrical continuity, disinfection and testing. The CONTRACTOR shallinstall the Water pipe and fittings to the horizontal and vertical alignment shown on theDrawings and shall complete all associated WORK described in this SUBMITTALSA. Water pipe : Material 2 PIPEA. Water pipe shall be ductile-iron pipe (DIP) conforming to the requirements of AWWAC151, with cement mortar lining conforming to the requirements of AWWA Thickness Class 50 pipe shall be used unless otherwise shown on the pipe shall have an exterior bituminous coating conforming to the requirements ofAWWA C110.

section 02601 – water pipe standard specification civil engineering water pipe projects and subdivision improvements page 02601-4 december 2003

Tags:

  Standards, Water, Pipe, 02601 water pipe, 02601, 02601 water pipe standard

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of 02601 - Water Pipe - Juneau

1 SECTION 02601 Water PIPESTANDARD SPECIFICATION CIVIL ENGINEERINGWATER PIPEPROJECTS AND SUBDIVISION IMPROVEMENTSPage 02601 -1 December 2003 PART 1 DESCRIPTIONA. The WORK under this Section includes providing all labor, materials, tools andequipment necessary for furnishing and installing buried Water pipe and fittings, thrustblocks, tie rods, electrical continuity, disinfection and testing. The CONTRACTOR shallinstall the Water pipe and fittings to the horizontal and vertical alignment shown on theDrawings and shall complete all associated WORK described in this SUBMITTALSA. Water pipe : Material 2 PIPEA. Water pipe shall be ductile-iron pipe (DIP) conforming to the requirements of AWWAC151, with cement mortar lining conforming to the requirements of AWWA Thickness Class 50 pipe shall be used unless otherwise shown on the pipe shall have an exterior bituminous coating conforming to the requirements ofAWWA C110.

2 All Water pipe shall be clearly marked with the manufacturer s name,type, class and/or thickness as applicable. Lettering shall be legible and permanent undernormal conditions of handling and JOINTSA. Unless otherwise shown on the Drawings, CBJ Standard Details, or as specified below, pipe joints shall be push-on rubber gasket type conforming to the requirements ofAWWA DIP placed within pipe casings shall have restrained joint connections. Refer to CBJS tandard Detail 413 Bored Restrained joint Water pipe shall be pipe TR FLEX, pipe field Loc Gasket,EBBA IRON Mega-lug System, Griffin Snap Lock, Pacific State Lock Mechanicaltype, or approved equal. Restrained push-on joints for pipe shall be designed for a waterworking pressure of 250 psi and shall be capable of being deflected a minimum of 3? perjoint, for pipe sizes through 18 inches, after FITTINGSA. Fittings for all Water pipe and restrained joint Water pipe shall be pipe TR FLEX,push-on gasket fittings compatible with pipe Field Loc Gasket, mechanical jointfittings with EBBA IRON Mega-lug System Griffin Snap Lock, Pacific State LockMechanical Type, or approved For connecting to existing Water mains, the CONTRACTOR shall use a mechanical jointtee and a mechanical joint cutting-in-sleeve similar to Clow F-1220 or Mueller H-843, orSECTION 02601 Water PIPESTANDARD SPECIFICATION CIVIL ENGINEERINGWATER PIPEPROJECTS AND SUBDIVISION IMPROVEMENTSPage 02601 -2 December 2003a cast iron coupling similar to Rockwell 431, or approved equal.

3 The length of all sleevesand couplings shall equal or exceed the diameter of the All valve clusters consisting of a tee and one or more valves, including fire hydrant legs,shall be monolithically restrained with EBBA Iron Mega-lug System, or THAW WIREA. Thaw wire and continuity straps shall be No. 2 copper wire, stranded, with THWinsulation or equal. Exothermic welding to attach continuity straps on DIP and fittingsshall be Cadweld or approved equal and coated with bituminous UNDERGROUND MARKING TAPEA. Underground marking tape shall be blue, six inch wide, four mil thick, polyethylene tapewith black lettering with the following wording: Caution: Waterline Buried Below. Marking tape shall be installed 12 inches above the top of all Water TIE RODSA. Tie rods shall be threaded black iron or mild steel with a 12-mil minimum asphalticcoating and shall be located symmetrically around the perimeter of the pipe usinganchorage lugs of standard manufacture for attachment where required.

4 Unless otherwiseshown on the Drawings, the number and size of the rods shall be as shown on the tablebelow: pipe SIZETIE ROD SIZENO. OF RODS4 10 212 16 418 20 622 1 424 1 CONCRETEA. Concrete for thrust blocks shall conform to Section 03302 Concrete TEMPORARY Water SYSTEMA. All piping, including hoses used for Water service, shall be NSF 3 GENERALA. The CONTRACTOR shall preserve and protect all existing utilities and other facilitiesincluding but not limited to: telephone, television, electrical, Water and sewer utilities,surface or storm drainage, highway or street signs, mail boxes, and survey 02601 Water PIPESTANDARD SPECIFICATION CIVIL ENGINEERINGWATER PIPEPROJECTS AND SUBDIVISION IMPROVEMENTSPage 02601 -3 December 2003 The CONTRACTOR shall immediately repair or replace utilities or other facilitiesdamaged during construction. The CONTRACTOR shall support and protect anyunderground utility conduits, pipes, or service lines where they cross the The CONTRACTOR shall give at least 24 hours notice to the CBJ Water and WastewaterUtility Divisions and the CBJ Engineering Department prior to:1.

5 Needing Water or sewer main line locates;2. interruption of Water service in any area; or3. use of Water from any fire Water service disruption shall be restored as soon as possible. The CONTRACTOR shall comply with the current policy on Water and Sewer Line Locates of the CBJP ublic Works Department, Water and Wastewater Utilities Divisions. TheCONTRACTOR shall notify all local radio stations and any major customers who will beaffected of a planned Water service Water pipe shall be installed in accordance with the manufacturer s printed specificationsand instructions, and in conformance with AWWA The Water pipe shall be handled carefully to prevent damage to the pipe , pipe lining, orcoating. Water pipe and fittings shall be loaded and unloaded using hoists and slings toavoid shock or damage, and under no circumstances shall they be dropped, skidded, orrolled.

6 If any part of the coating or lining is damaged, repair thereof shall be made in amanner satisfactory to the ENGINEER at the CONTRACTOR s All Water pipe and fittings shall be inspected for defects. Damaged pipe will be rejectedand the CONTRACTOR shall immediately place all damaged pipe apart from theundamaged and shall remove the damaged pipe from the site within 24 Whenever it becomes necessary to cut a length of Water pipe , the cut shall be made byabrasive saw or by special pipe All pipe ends shall be square with the longitudinal axis of the Water pipe and shall bereamed and smoothed to assure a good The Water pipe shall be laid to the horizontal and vertical alignment shown on theDrawings. A minimum five foot cover shall be maintained from finish grade to top ofwater pipe , unless otherwise shown on the Drawings. Fittings shall be installed at thelocation shown on the To prevent dirt and other foreign material from entering the pipe and fittings duringhandling and installation, the open end of the pipe shall be protected by a Water -tight plugat all times except when joining the next section of Under no circumstances shall pipe deflections, either horizontal or vertical, exceed themanufacturer's printed recommendations.

7 Where deflections would exceed themanufacturer s recommendations, fittings shall be 02601 Water PIPESTANDARD SPECIFICATION CIVIL ENGINEERINGWATER PIPEPROJECTS AND SUBDIVISION IMPROVEMENTSPage 02601 -4 December 2003I. Vertical deflections to avoid obstructions that exceed allowable Water pipe jointdeflections shall be accomplished by the use of fittings and either joint restraints orvertical thrust blocking conforming to the Standard Details. Additional fittings to thoseindicated on the Drawings will be required to accomplish these vertical Concrete thrust blocks shall be furnished and installed in accordance with the Drawingsand Standard Pressurized Water pipe ends shall be plugged and thrust blocks installed. Volume andbearing area of thrust blocks for end plugs shall be equal to applicable standards forbends greater than 45?.L. Existing Water pipes and appurtenances to be removed or abandoned shall be asdesignated on the Drawings or directed by the ENGINEER.

8 Abandoned Water servicesshall be plugged at the cut ends. Abandoned Water pipes shall be removed as shown onthe Drawings, or mechanically plugged if not required to be All pipe fittings shall be restrained with EBBA Iron Megalug System, or All joints within 50 feet of tees or bends equal to or greater than 45? shall be Continuous Water services shall be provided for all structures, except for interruptionsnecessary for connection of temporary or new piping to the existing service or The CONTRACTOR is responsible for maintaining continuous Water service at volumeand pressure to match existing to all structures, with either existing, temporary or newpiping, except as provided in this FLUSHING, TESTING AND DISINFECTIONA. Prior to acceptance, the CONTRACTOR shall Open-Bore flush the Water pipe thenperform hydrostatic tests, electrical continuity tests, and disinfection and coliform may be done in any sequence.

9 However, in the event the disinfection, coliformand continuity tests have been performed and repairs are made to the Water pipe systemin order to pass the hydrostatic test, all previous tests and the Open-Bore flushing shallbe repeated to the satisfaction of the OPEN-BORE FLUSHINGA. Open bore flushing is required of all installed Water pipes to remove any foreign CONTRACTOR shall furnish, install and remove all pumps, fittings and pipesnecessary to perform the flushing; shall provide all additional excavation and backfill;and shall dispose of all Water and debris flushed from the Water pipe . Flushing throughfire hydrants, reduced outlets or fittings shall not be permitted unless specificallyauthorized in writing by the ENGINEER. The CONTRACTOR shall notify theSECTION 02601 Water PIPESTANDARD SPECIFICATION CIVIL ENGINEERINGWATER PIPEPROJECTS AND SUBDIVISION IMPROVEMENTSPage 02601 -5 December 2003 ENGINEER, in writing, 48 hours in advance of any flushing operation.

10 All flushing shallbe done between the hours of 1:00 , and 5:00 , unless otherwise authorized bythe ENGINEER. A flushing scheme and schedule shall be submitted by theCONTRACTOR for review and approval by the ENGINEER prior to flushing. Theschedule for flushing must be approved by the CBJ Water Utility Division. TheCONTRACTOR shall be responsible for obtaining any permits necessary for HYDROSTATIC TESTINGA. Hydrostatic testing will be conducted in the presence of the ENGINEER on newlyinstalled Water pipes after Open-Bore flushing, in accordance with the requirements ofAWWA C600 and as stated hereafter. The CONTRACTOR shall furnish all assistance,equipment, labor, materials, and supplies necessary to complete the test to the satisfactionof the ENGINEER. The CONTRACTOR shall suitably valve-off or plug the outlet toexisting or previously-tested Water pipe prior to performing the required hydrostatic to testing, all air shall be expelled from the Water pipe .