Example: barber

ANGLO PLATINUM LIMITED CONCENTRATORS - …

ANGLO PLATINUM LIMITEDCONCENTRATORSANALYST AND FUND MANAGER VISIT 27 May 2005 LocationCapacity 30 day monthThroughput aver pm 2004RS Tailings retreatment400,000362,000 Frank Plant155,000145,000 Waterval Plant360,000351,000 Klipfontein Plant120,000109,000 Waterval UG2 Plant400,000419,000 Ivan Plant120,000141,000 Mortimer Merensky Plant80,00080,000 Mortimer UG2 Plant250,000233,000 Amandelbult Mer Plant340,000288,000 Amandelbult UG2 Plant220,000210,000 Amandelbult Opencast Plant30,00040,000 BRPM Plant200,000198,000 PPL Plant385,000373,000 LPM UG2 Plant50,00064,000 LPM Merensky Plant80,00085,000 Modikwa Plant200,000197,000 Total3,390,0003,295,000 Total number of Employees3,233 Group Average Cash cost per ton milledR 42 Group Average Cash cost per Refined Pt ounceR 683 CONCENTRATORS capacity and contextConcentratorSafety AchievementsLebowa- 466 IFDA mandelbult- 101 IFDM ortimer -281 IFD Ivan- 850 IFDK lipfontein- 1038 IFDWval UG2- 1353 IFD Wval Mer-360 IFDF rank- 518 IFDPPL- 231 IFD (IFD Injury Free Days)Klipfontein won the MMMA safety c

anglo platinum limited concentrators analyst and fund manager visit 27 may 2005

Tags:

  Limited, Platinum, Concentrator, Anglo, Anglo platinum limited concentrators

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of ANGLO PLATINUM LIMITED CONCENTRATORS - …

1 ANGLO PLATINUM LIMITEDCONCENTRATORSANALYST AND FUND MANAGER VISIT 27 May 2005 LocationCapacity 30 day monthThroughput aver pm 2004RS Tailings retreatment400,000362,000 Frank Plant155,000145,000 Waterval Plant360,000351,000 Klipfontein Plant120,000109,000 Waterval UG2 Plant400,000419,000 Ivan Plant120,000141,000 Mortimer Merensky Plant80,00080,000 Mortimer UG2 Plant250,000233,000 Amandelbult Mer Plant340,000288,000 Amandelbult UG2 Plant220,000210,000 Amandelbult Opencast Plant30,00040,000 BRPM Plant200,000198,000 PPL Plant385,000373,000 LPM UG2 Plant50,00064,000 LPM Merensky Plant80,00085,000 Modikwa Plant200,000197,000 Total3,390,0003,295,000 Total number of Employees3,233 Group Average Cash cost per ton milledR 42 Group Average Cash cost per Refined Pt ounceR 683 CONCENTRATORS capacity and contextConcentratorSafety AchievementsLebowa- 466 IFDA mandelbult- 101 IFDM ortimer -281 IFD Ivan- 850 IFDK lipfontein- 1038 IFDWval UG2- 1353 IFD Wval Mer-360 IFDF rank- 518 IFDPPL- 231 IFD (IFD Injury Free Days)

2 Klipfontein won the MMMA safety competition for Category A for having Zero reportable injuries for the period June 03 to July the other Rustenburg CONCENTRATORS received a MMMA certificate of merit for having Zero reportable injuries for the period June 03 to July 04 ISO 14001 Accreditation OSHAS 18000 AccreditationConcentrating StrategyConcentrating Strategy Match capacity to growth profile. Match technology to ore type. Reduce costs. Do it Strategy Total integration of Safety, Health and Environment in terms of Systems, People and in capacity Group expansion profile is in place. New capacity is built as required. Introduce technology improvements Optimisation over ImprovementStrategic focus on RecoveryProcess StabilityProcess Control DrivePlant recipesExpert Control SystemsParticle size measurement as primary control inputPlant.

3 Mine bufferProcess OptimisationPlant surveysCircuit configuration- 2 concentrate & Cr2O3 Open circuit cleaningChemical & mineralogical size by size on F, T and C routinelyModelling of circuitsOre typing at pilot plantReagent protocolsNew technologyGrinding testingprogrammeDMS test programmeReagents developmentLaunders & circuit design Close coordination of technical support function with the operating plants Technical support, DML & Consulting Metallurgist & R&D ARC-AARL developments Process Control GroupEnhanced process focus Fit for FutureRecovery Imperatives Consistent Operation Focus on Basics Sound Circuit Configuration Optimise Ore Distribution/Blending Grade/Recovery matching with Smelter Enhanced Technical Focus Fit For FutureConcentrator ManagerPlant ManagerTechnical ManagerResident EngineerHR Co-ordinatorAccountantShiftsDay Shift LeaderSection EngineerEnvi ronm e nta l TechnicianTailings DamMetallurgistMet.

4 LaboratoryMe tal AccountingOccupational Hygiene TechnologistMore focussed structureImprove Smelter Recovery Excess Smelter capacity Increase mass pull Manage closing of window Reducing chrome to the SmelterMass Pull vs Recovery PullRecoveryKU20 LVG2 CZD512KU20 MP-RECLVG2 TRENDCZD TRENDCost Reduction Increased use of Supply Chain Internal/External benchmarking initiatives. Cost Awareness Campaign culture changeOperational Performance Rustenburg SectionAnglo PLATINUM ConcentratorsConcentrator profile supports mining profileConcentrator Tons Treated20,000,00025,000,00030,000,00035, 000,00040,000,00045,000, TonsTailingsUG2% (excluding W LTR)Rustenburg SectionCombined Head Grade (4E)Excluding W estern Limb PLATINUM ConcentratorsRustenburg SectionHead Grade (4E) PLATINUM ConcentratorsRustenburg SectionRecoveries (4E)

5 PLATINUM ConcentratorsOperating CostsRustenburg SectionConcentrator Cash Cost per Ton milledR/ton PLATINUM ConcentratorsRustenburg SectionConcentrator Cash Cost per Equivalent Refined Pt OZ0100200300400500600700800 YearR/Pt ozR/Pt oz543607683200220032004 ANGLO PLATINUM ConcentratorsKey Business Issues Match capacity to growth profile. Match technology to ore type. Reduce costs. Do it