ARB Approved Installation, Operation and Maintenance Manual

ARB ApprovedInstallation, Operation and Maintenance ManualforExecutive OrdersVR-201-C(Healy Phase II EVR System)andVR-202-C(Healy Phase II EVR System IncludingVeeder-Root In-Station Diagnostic (ISD) System) Approved : May 9, 2007 NOTICE:The ARB Approved Installation, Operation and Maintenance Manual for VR-201-C and VR-202-C describes the tools, method and skill levels required to install both the Healy Phase II EVR System Not Including ISD, ARB Executive Order VR-201-C and the Healy Phase II EVR System Including Veeder-Root ISD System, ARB Executive Order specifi ed otherwise, only skilled technicians that are trained, certifi ed and licensed by Healy Systems, Inc. ( Healy Certifi ed Technicians) are able to perform installation, Maintenance or repairs of components manufactured by Healy Systems, Inc.

Veeder-Root ISD Vapor Flow Meter Installation Manual Veeder-Root ISD Pressure Sensor Installation Guide 4 All components listed on this page of the Table of Contents are ONLY applicable to Executive Order VR-202-C (Healy Phase II EVR System with Veeder-Root ISD System).

Tags:

  Flows, Meters, Vapor, Isd vapor flow meter

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of ARB Approved Installation, Operation and Maintenance Manual

1 ARB ApprovedInstallation, Operation and Maintenance ManualforExecutive OrdersVR-201-C(Healy Phase II EVR System)andVR-202-C(Healy Phase II EVR System IncludingVeeder-Root In-Station Diagnostic (ISD) System) Approved : May 9, 2007 NOTICE:The ARB Approved Installation, Operation and Maintenance Manual for VR-201-C and VR-202-C describes the tools, method and skill levels required to install both the Healy Phase II EVR System Not Including ISD, ARB Executive Order VR-201-C and the Healy Phase II EVR System Including Veeder-Root ISD System, ARB Executive Order specifi ed otherwise, only skilled technicians that are trained, certifi ed and licensed by Healy Systems, Inc. ( Healy Certifi ed Technicians) are able to perform installation, Maintenance or repairs of components manufactured by Healy Systems, Inc.

2 Or warranty will be is the responsibility of each Healy Certifi ed Technician to be familiar with the current requirements of state, federal, local codes and air district rules and regulations for installation and repair of gasoline dispensing is also the responsibility of the Healy Certifi ed Technician to be aware of all the necessary safety precautions and site safety requirements to assure a safe and trouble free specifi ed otherwise, only skilled technicians that are trained, certifi ed and licensed by Veeder-Root are able to perform installation, Maintenance or repairs of components manufactured by Veeder-Root, or warranty will be is the responsibility of each Veeder-Root technician to be familiar with the current requirements of state, federal, local codes and air district rules and regulations for installation and repair of gasoline dispensing is also the responsibility of the Veeder-Root technician to be aware of all the necessary safety precautions and site safety requirements to assure a safe and trouble free copy of the In-Station Diagnostic System Troubleshooting Guide can be found at confi rm a Healy Certifi ed Technician training status a regulator can go to the following website: The list contains list is update periodically.

3 To confi rm Veeder-Root TLS or ISD training a regulator should send an email to with the name (and company) of the ASC to obtain verifi cation of the ASC TLS/ISD training status or call 800-997-7725 and press * to get to the Veeder-Root menu and * again to speak to a of ContentsHealy Installation, Operation and Maintenance Manual1 Component Manufacturer/Model Starts on PageScheduled Maintenance Healy Phase II EVR System 1 Nozzle Healy Model 900 10 Tank Pressure Management System Healy Model 9961 20 Inverted Coaxial Hoses Healy Model 75 Series 27 Hose Adaptors Healy Model CX6 Series 30 Reconnectable Breakaway Couplings Healy Model 8701VV 31 Healy Model 807 34 Flow Limiters Healy Model 1301 37

4 Healy Model 1302 38 Pressure/Vacuum Vent Valve Husky Model 4885 39 Dispensers with Healy Model VP1000 Vacuum Pump Gilbarco Encore 300 & 500 Series2 40 Gilbarco GasBoy 9800 Series 73 Wayne Harmony Series (Balance) 93 Wayne Harmony Series (Assist) 112 Wayne Ovation Series 132 1 All components listed on this page of the Table of Contents are applicable to both Executive Order VR-201-C (Healy Phase II EVR System Not Including ISD) and Executive Order VR-202-C (Healy Phase II EVR Systems with Veeder-Root ISD System).2 An additional section, Section 18 has been added which provides instruction on how to install the VP1000 vacuum pump in the dispenser cabinet to allow for the ISD fl ow meter to be installed above the vapor shear Installation, Operation and Maintenance Manual3 Component Manufacturer/Model Starts on PageDispensers with Healy Model VP1000 Vacuum Pump (Continued)Wayne Vista Series 156 Wayne Global Century,Select and Reliance Series 173 Healy Universal Manual 1903 All components listed on this page of the Table of Contents are applicable to both Executive Order VR-201-C (Healy Phase II EVR System Not Including ISD)

5 And Executive Order VR-202-C (Healy Phase II EVR Systems with Veeder-Root ISD System).Veeder-Root In-Station Diagnostics (ISD) Install, Setup, & Operation Guide and Manuals4 Veeder-Root ISD Install, Setup, & Operation ManualVeeder-Root isd vapor flow meter Installation ManualVeeder-Root ISD Pressure Sensor Installation Guide4 All components listed on this page of the Table of Contents are ONLY applicable to Executive Order VR-202-C (Healy Phase II EVR System with Veeder-Root ISD System).ARB Approved IOM Executive Orders VR-201-C and VR-202-C (Scheduled Maintenance ) Page 1 Healy Systems Scheduled Scheduled Maintenance Instructions for a Healy System with VP1000 Vacuum Source and 900 Series EVR problems are usually caused by installation irregularities that are easily detected and repaired by performing the VP1000 Vacuum Performance Test Procedure located in the dispenser installation Manual .

6 Periodic Maintenance described here will eliminate problems and maintain peak Operation of the : Only a Healy Certifi ed Technician can service any problems discovered while conducting the Weekly or Quarterly Inspection and Testing. For information regarding Healy Certifi ed Training Courses please contact a local Healy Distributor. Healy Distributors can be found on the Healy website @ or you can call Healy Systems direct @ 603-882-2472 for more Weekly Inspection and Testing Inspect each nozzle, hose, and breakaway for damage, loose connections, or leaks. Inspect nozzles for damaged vapor boots or spouts. Any nozzle with a vapor collection boot which is missing, or which has one half of the mini-boot faceplate or greater missing should be replaced or repaired as soon as practicable.

7 Spouts with visible damage must be replaced. Inspect hoses for wear, severe kinks, cracks, and splitting. Replace if wire braid is visible. Test the VP1000 Vacuum Pump for normal Operation using the following test procedure: Normal Operation will have the VP1000 Vacuum Pump running at low speed if only one side of a dispenser / pump is activated (ready to dispense fuel) and will run at full speed if both sides of the dispenser are activated (ready to dispense fuel). The VP1000 vacuum pump may continue to run for a few seconds after a nozzle is : If any of the four bullets below cannot be achieved, tag out dispenser and call a Healy Certifi ed Technician for service. The VP1000 vacuum pump should come on immediately when a nozzle is lifted and the dispenser is activated and ready to dispense fuel.

8 Repeat for each nozzle on both sides of the dispenser being tested, one at a time, to verify the VP1000 vacuum pump is running after the dispenser is activated and ready to dispense Approved IOM Executive Orders VR-201-C and VR-202-C (Scheduled Maintenance ) Page 2 NOTE: For unihose dispensers, conduct individual tests for each product grade on each side of the dispenser to ensure that the VP1000 activates for all grades on the same side. Leave one nozzle activated on the fi rst side and with the pump running, lift a nozzle on the other side of the dispenser (activated as above) and listen for a change of speed (increase) in the pump motor. Return both nozzles to the dispenser. Repeat the above procedures to activate both sides of the dispenser, but start with the opposite side of the dispenser.

9 If the above procedures can be confi rmed by starting with the opposite side of the dispenser, the VP1000 vacuum pump is correctly installed. After the VP1000 vacuum pump gets to second speed, it will not drop back to single speed until one nozzle is : In parts of the country where the outside temperature drops below 35 F, the VP1000 vacuum pump motor will automatically run at a very low RPM to prevent freezing. This is normal Quarterly Inspection and Perform Weekly Inspection prior to Quarterly Inspect the VP1000 vacuum pump for loose or damaged vapor line connections. If copper tubing is kinked or loose remove the dispenser from service and call a Healy Certifi ed Technician for service.

10 Check product dispensing fl ow rate at maximum (handheld) dispensing position. Verify fl ow rate is between gpm and Replace dispenser fi lters when fl ow rate is below gpm and check fl ow rate again. If the fl ow rate does not increase after fi lter change, remove the fueling point from If fl ow rates exceed gpm, install either Healy Model 1301 or 1302 Flow Limiter and check fl ow rate again. If fl ow rate still exceeds gpm, remove the fueling point from service. Check Clean Air Separator for proper operating confi guration. SeeEO VR-201-C or VR-202-C, Exhibit 2, Figure 2B-2 for Approved IOM Executive Orders VR-201-C and VR-202-C (Scheduled Maintenance ) Page Annual Inspection and Testing to Be Performed By a Healy Certifi ed following procedures are recommended to be conducted in the order Perform weekly and quarterly inspection prior to Annual Conduct static pressure performance of the Healy Clean Air Separator (EO VR-201-C or VR-202-C, Exhibit 4).