Example: stock market
BASIX Rainwater Harvesting System Guidelines
The detention volume must be in addition to the rainwater tank size required to meet BASIX certificate commitments. As in Figure 3 the tank configuration must be designed to leave the detention capacity free. If a property is located in a bushfire prone area (confirm with the relevant local council), rainwater
Tags:
Information
Domain:
Source:
Link to this page: