Bill Of Quantities - UNDP

PROJECT NAME: CONSTRUCTION OF MENTAL HEALTH CENTER-Halhoul Palestinian Authority Ministry of Health Donner: Group Agence Francaise De Developpement Implemented By: United Nation Development Programe Programe Of Assistane to the Palestinian People In Coordination with Ministry Of Health Designed By: Al-Ta'meer Office for Engineering Studies and Consultations bill Of Quantities Mental Health Center / HalhoulBill of Quantities 1 / 22 ItemDescriptionUnitQty Unit Price Amount WorksThe Contractor shall when pricing the rates of the bills, take into consideration to include and allow for costs or expenses of all requirements stipulated in the preambles, drawings, and technical specifications, bearing in mind that the constriction works should not impede or affect the daily activities of the functional health center underneath. The unit rate shall include the following costs and remove all obstacles on the existing roof in order to start the construction of the new floor.

The Contractor shall when pricing the rates of the bills, take into consideration to include and allow for costs or expenses of all requirements stipulated in the …

Tags:

  Bill, Quantities, Bill of quantities

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Bill Of Quantities - UNDP

1 PROJECT NAME: CONSTRUCTION OF MENTAL HEALTH CENTER-Halhoul Palestinian Authority Ministry of Health Donner: Group Agence Francaise De Developpement Implemented By: United Nation Development Programe Programe Of Assistane to the Palestinian People In Coordination with Ministry Of Health Designed By: Al-Ta'meer Office for Engineering Studies and Consultations bill Of Quantities Mental Health Center / HalhoulBill of Quantities 1 / 22 ItemDescriptionUnitQty Unit Price Amount WorksThe Contractor shall when pricing the rates of the bills, take into consideration to include and allow for costs or expenses of all requirements stipulated in the preambles, drawings, and technical specifications, bearing in mind that the constriction works should not impede or affect the daily activities of the functional health center underneath. The unit rate shall include the following costs and remove all obstacles on the existing roof in order to start the construction of the new floor.

2 Unit price shall include cost of demolishing and removal of all elements covering the steel reinforcement for the columns starters on the existing roof, such concrete, blocks, stone, filling , including the preserving and cleaning of steel reinforcement for proper erection of the new columns (this is true for all existing columns including perimeter columns), also the price include dismantle and demolish parts of the existing stone roof parapet at all height as shown on detailed drawing (A04), Engineer instructions ,and and rebuild the existing stone coping. The price includes stone pointing according to drawing (A04) , Engineer instructions ,and and removal of concrete slab of the staircase ,including the protection and preservation of all existing finishing works, and all other electrical& mechanical utilities, fittings and equipments, machines.. and removal of the cement sand screed on the existing roof. Rate includes removal of bituminous membrane and all requirements as per specification, drawings & engineer section 1, demolishing works carried to summaryMental Health Center / HalhoulBill of Quantities 2 / 22 ItemDescriptionUnitQty Unit Price Amount WorksSupply and cast the specified concrete for all bill items described below.

3 Price shall include cost of supplying and fixing the required steel reinforcement, as per the drawings and specifications, all the associated costs of material and engineering measurement will be and cast reinforced concrete grade 'B 300' with a minimum cement content of 350 Kg. per cubic meter for Stairs, landing, and where required. Price includes making opening in the existing wall for drop beams ,and the drop beams as per drawing (S06 ),and specifications. and cast reinforced concrete grade 'B 300' for columns with a minimum cement content of 400 Kg. per cubic meter and cast 26cm thick ribbed slab. Unit price shall include cost of supplying and laying lightweight blocks density 25kg/m , (Etolite size 50X20X12, the cement block is 6cm thick) and the required steel reinforcement. Price shall include drop beams, projected beams, and all other beams and projections as per drawing (S06 ),and specifications.

4 And cast 15cm thick solid slab. Unit price shall include cost of supplying and laying the required steel reinforcement, beams as per drawing (S09) ,and section 2, concrete works carried to summaryMental Health Center / HalhoulBill of Quantities 3 / 22 ItemDescriptionUnitQty Unit Price Amount WorksThe contractor shall, when pricing the rates of this bill , shall include costs and expenses of all the requirements stipulated in the preambles, drawings and specification. Unit rate of the stone wok shall be in accordance with specifications and shall covers all costs detailed here below:Supply and build stone class A-A, complying to the general and the following specifications: - Absorption by weight should not exceed using ASTM test method C97 - Density (Kg/m3) should not be less than 2700Kg/m3 using ATSM test method C97 - Compressive strength should not be less than 56 MPa using ATSM test method C170 - Modulus of rupture should not be less than using ATSM test method C99 - Abrasion resistance (hardness) should not be less than 10 using ATSM test method C241 - stone should be clear, free from all veins, cracks and salt holes from both sidesB200 concrete backing, 15cm thick, behind stone as per drawings and as pointing works composed of white cement and sand (1: 2) with approved additives for better workability, tightness and water proofing.

5 Cost of all required stone pieces, similar to the pieces at the existing stone work, unless otherwise of stone lintels, window jambs, corner stones 12 cm thick, similar to existing, including steel reinforcement for stone cladding of 6mm steel mesh @ 20cm both directions. The stone shall be fixed to the steel and concrete by drilling 2 holes in each stone and using 3mm galvanized steel and build 5cm thick stone for walls, as per drawings and specifications, and Engineer & install one side edge dressed stone coping 3cm thick and of (25) cm width for the roof parapet copping "Jama'een stone" . The price includes stone pointing. according to drawings, Engineer instructions ,and specifications. & install one side windows sills 3cm high, 33 cm section 3, stone works carried to summaryMental Health Center / HalhoulBill of Quantities 4 / 22 ItemDescriptionUnitQty Unit Price Amount works:The contractor shall, when pricing the rates of this bill , take into consideration including and allow for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the cast Concrete hollow bearing blocks built in cement sand mortar (1:3) mix as and install hollow concrete blocks built with cement sand mortar (1:3) mix as specified.

6 The unit price shall include cost of 20cm minimum high concrete lintel beams (ring beam) above concrete block walls, at doors/windows level, and at all block walls parameter. Unit rate shall include cost of steel reinforcement of 4Ф12mm steel bars with Ф 6mm stirrups@20cm 7cm thick hollow concrete blocks thick hollow concrete blocks thick hollow concrete blocks section 4, block works carried to summaryMental Health Center / HalhoulBill of Quantities 5 / 22 ItemDescriptionUnitQty Unit Price Amount works:The contractor shall, when pricing the rates of this bill , take into consideration to include and allow for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the and install 4 mm thick layers of modified bituminous membrane like Pazkar SBS 5/250 laid above two primer coats of GS474 at a rate of kg /m2 or equivalent approved by the engineer on a clean surface of the roof tiling and around the parapets.

7 The price includes supply and install an approved sealant cover at groove. The price includes also supply and install 7*7cm angle fillet as shown in the drawings. The application should be carried out in conformity with the manufacturers specifications and using propane torch welding and install a rigid polystyrene boards 3cm thick "Randopan" or equivalent with density 32kg/m where needed as per drawings , specifications and engineers' & cast special plain concrete for screed on the roof with 1% slope, min thickness 3 cm at the drain point. Rate include lining, hunching 5x5 cm with (45 ) to the edge of roof screed and parapet, rate also include smooth surface finish to receive bitumen and all requirements as per specifications, drawings & engineer section 5, roofing works carried to summaryMental Health Center / HalhoulBill of Quantities 6 / 22 ItemDescriptionUnitQty Unit Price Amount Works:The contractor shall, when pricing the rates of this bill , take into consideration including and allow for the costs or expenses of reinforcing wire mesh , stop beads , angle beads , bonding agent and all requirements stipulated in the preambles, drawings and technical specification of the three coats of internal plastering for the walls and two coats for ceilings, composed of a bond coat, a base coat 1:4, and a finishing coat 1.

8 5 as and apply cement sand filling layer to the ceiling and walls above false ceiling , but external plastering for parapet, walls and wherever needed composed of 3 coats a bond coat 1:1, a base coat 1:4 and a finish coat 1:2 with waterproofed liquid all as section6, plastering works carried to summaryMental Health Center / HalhoulBill of Quantities 7 / 22 ItemDescriptionUnitQty Unit Price Amount and Wall , Install and finish class "A" 30x30 cm Terrazzo floor tiling , with Italian marble chipping # 4. Price shall include, bedding and jointing in cement and sand mortar, grouting with white cement, required sand fill, polishing and cleaning. Price shall also include Terrazzo skirting size (30 x 7 x ) cm. , but for staircase landing. Price shall include marble and install glazed tiles for walls cladding 20x20 class (A), Spanish made or equivalent. The tiles shall be laid and fixed to the walls by approved bonding agents.

9 Price includes cost of surface preparation to receive tiles , which shall include two coats of cement plaster (scratch and float coat) and approved adhesive materials, accessories and grounding. Color of the tiles shall be as chosen by the and install non slip 20x20* ceramic tiles, Spanish made or equivalent class (A) for flooring, as specified and approved by the Engineer. The price includes the mortar (1:3) the sand cement fill. The color of the tiles shall be as chosen by the and install first quality 3cm thick local marble(SUR-MEEN) for stair threads, 115x35x3cm, polished one face & edge . The threads should be bedded on 3cm mortar (1:3). The rate also includes cost of marble risers and skirting .MR23 Total section 7, Tiling works carried to summaryMental Health Center / HalhoulBill of Quantities 8 / 22 ItemDescriptionUnitQty Unit Price Amount and joinery doors and windows:Supply and install the following 45mm thick plywood doors, the unit rate should include the following costs:Door frame made of soft wood, thickness 45 mm to be fitted to over all width of the cm soft wood around the door soft wood frame all around the door leaf grooved to receive the door fillLockers and cylinders type Wally (Original), bathroom lock and cylinder4mm plywood facing from both sides, with 6mm thick glass, as shown on wood Recitative ( )cmDoor stopper as made by Domicile # DH005 Panting the door and frames with oil paint, as instructed and approved by the Engineer.

10 Unit rate shall include cost for preparing surface, sanding, primer, two coats of putty, one undercoat and two coats of matt enamel paints mixed Wooden door D1, with an overall dimensions of 210x90cm. As shown in drawing (A27) Wooden door D2 with hinge in two directions, with an overall dimensions of 210x80cm. As shown in drawing (A27) , supply and install the following units, as per drawings with all fixing accessories, drawers, shelves, hardware, and ironmongery and made of:18mm or 30mm thick plywood for wall hung and lower cabinets, 12mm thick sandwich panel for shelves laminated with regular Formica. For dimensions refer to detailed drawings. Room 05 kitchen lower cabinets including granite absolute counter top "Tiger eye" with top& bottom skirting, beads, polishing, rounding, ,and all preparatory works for the installation of the required sink and sanitary fixtures. As shown in Drawing(A 32) section 8, carpentry and joinery works carried to summaryMental Health Center / HalhoulBill of Quantities 9 / 22 ItemDescriptionUnitQty Unit Price Amount ceiling:The contractor shall, when pricing the rates of this bill , take into consideration including and allow for the costs or expenses of all requirements stipulated in the preambles, drawings and technical specification of the contract.