Transcription of Building Laborers’ Labor Agreement
1 Building Laborers'. Labor Agreement Wisconsin Laborers'. District Council and Local Union No. 113. 2017 2019. Milwaukee, Waukesha, Ozaukee, Washington Counties INDEX. 2017-2019 Building LABORERS Agreement . 39 33. Call-In and Reporting 14. Coffee 33. DURATION OF 54. ENFORCEMENT OF PAYMENTS TO. FRINGE BENEFIT 27. Extended Work 11. GENERAL 29. GEOGRAPHICAL JURISDICTION. & DEFINITION OF GENERAL 2. HEALTH 19. HOLIDAY 58. HOURS OF 10. INDUSTRY ADVANCEMENT PROGRAM/. CONTRACT 46. JURISDICTIONAL 37. Key Man 32. Light Duty 44. Market 59. NO 58. 51. 11. OWNER MANDATED 36. Payment of 17. PENSION 25. PICKET 50 2017-2019 Building LABORERS' Agreement . 1. REFRACTORY 51 THIS Agreement made and entered into this 1st 42.
2 Day of June, 2017, by and between the ALLIED CON- STRUCTION EMPLOYERS ASSOCIATION, INC. 42 of Waukesha County, THE ASSOCIATED GENER- Schedule of Wages and Job 56 AL CONTRACTORS OF GREATER MILWAUKEE, SEPARABILITY 50 INC. of Milwaukee County, hereinafter referred to as SETTLEMENT OF 37 the Associations, and the WISCONSIN LABORERS'. SPECIAL WAGE 15 DISTRICT COUNCIL and its affiliated Local Union 113 of the LABORERS' INTERNATIONAL UNION. 18. OF NORTH AMERICA of the Counties of Milwaukee, SUBSTANCE ABUSE TESTING AND Waukesha, Washington and Ozaukee, State of Wisconsin, ASSISTANCE 43 hereinafter referred to as the Union.. TRANSFER OF COMPANY TITLE OR 50. Travel and 36. TRAVEL AND 36 WITNESSETH. UNION 9. That the parties hereto, for and in consideration of the VACATION 21 mutual promises and obligations hereinafter imposed, 15 and mutual benefits derived, agree to and with each other WISCONSIN LABORERS APPRENTICESHIP as follows: & TRAINING FUND AND 46.
3 WORKER'S AND UNEMPLOYMENT 44. RECOGNITION. The Union has claimed and demonstrated and the em- ployer is satisfied and acknowledges that the Union rep- resents a majority of the employer's employees in the bargaining unit covered by this Labor Agreement . The employer hereby recognizes the Union as the exclusive bargaining agent under 9 (a) of the National Labor Rela- tions Act for all employees performing work within such collective bargaining unit of all present and future jobs sites within the geographic jurisdiction covered by this Labor Agreement . 1. ARTICLE I such purpose including fork lifts. GEOGRAPHICAL JURISDICTION & DEFINI- TION OF GENERAL laborer Unloading, handling and distributing of all materials, fix- tures, furnishings and appliances from point of delivery Section This contract shall cover all general Labor to stockpiles and from stockpiles to approximate point of working on construction projects in Milwaukee, Wauke- installation.
4 Sha, Washington and Ozaukee Counties. It shall cover all laborers working on the job site or in a contractor's yard Drying of plaster, concrete, mortar or other aggregate, when such yard work involves only supplies and materials when done by salamander heat or any other drying process. which are to be incorporated directly into a construction project. Cleaning and clearing of all debris, including wire brush- ing of windows, scraping of floors, removal of surplus Section laborer 's Jurisdictional Work. The follow- material from all fixtures within confines of structure ing work jurisdiction is claimed by the Union . and cleaning of all debris in Building construction area. The general cleanup, including sweeping, cleaning, wash Servicing: Servicing masons, plasterers, cement finish- down and wiping of construction facility, equipment and ers, carpenters, ironworkers, electricians, and all pipe furnishings and removal and loading or burning of all trades workers while working for general contractors debris including crates, boxes, packaging waste material.
5 And sub-contractors performing covered work under this Washing or cleaning of walls, partitions, ceilings, win- Agreement whether by use of hand, pneumatic, electric, dows, bathrooms, kitchens, laboratory, and all fixtures motor combustion or air driven tools or equipment neces- and facilities therein. Clean-up, mopping, washing, wax- sary for the performance of work described herein. These ing and polishing or dusting of all floors or areas. tools shall also include forklifts, articulating / rotating forklifts, walk along cranes skid steers and attachments The aging and curing of concrete, mortar and other mate- as well as skid steer type track loaders and/or equipment rials applied to walls, floors, ceilings and foundations of operated by remote control and/or machines of similar or buildings and structures, highways, airports, overpasses like characteristics.
6 And underpasses, tunnels, bridges, approaches, viaducts, ramps or other similar surfaces by any mode or method. Tending shall consist of preparation of materials and the handling and conveying of materials to be used by Scaffolds: Erection, planking and removal, of all scaf- mechanics of other crafts, whether such preparation is folds for lathers, plasterers, bricklayers, masons and oth- by hand or any other process. After the material has er construction trades crafts. Building , planking or instal- been prepared, tending shall include the supplying and lation and removal of all staging, swinging and hanging conveying of said material and other materials to such scaffolds, including the setting and operation of mechan- mechanic, whether by bucket, hod, wheelbarrow, bug- ical scaffolding/Hydro-Mobile type scaffolding, includ- gy, trucks, skid loaders or other motorized units used for ing maintenance thereof, regardless of height.
7 2 3. Excavations and Foundations - Site Preparation and Concrete, Bituminous Concrete and Aggregates: Clearance Transportation and Transmission Lines: Exca- (a) Concrete, bituminous concrete, or aggregates for vation for Building and all other construction; digging of walls, footings, foundations, floors or for any other trenches, piers, foundations and holes; digging, lagging, construction. Mixing, handling, conveying, grouting, sheeting, cribbing, bracing and propping of foundations, rough grading, pouring, in piling, vibrating, gun- holes, caissons, cofferdams, dams, dikes and irrigation niting and otherwise placing/applying concrete or trenches, canals and all handling, filling and placing of aggregates, whether done by hand or any other pro- sand bags connected therewith.
8 All drilling, blasting and cess. Wrecking, stripping, dismantling and handling scaling on the site or along the right-of-way, as well as concrete forms whether used or reused and false access roads, reservoirs, including areas adjacent or per- work. Building of centers for fireproofing purpos- tinent to construction site; installation of temporary lines. es. Operation of motorized wheelbarrows or buggies, forklifts, all-terrain forklifts, utility tractors and at- Preparation and compacting of roadbeds for railroad tachments, skid-steer type track loaders and all or track laying, highway construction and the preparation of machines of similar or like characteristics, whether trenches, footings, etc. for cross-country transmission by run by gas, diesel or electric power.
9 When concrete pipelines or electric transmission or underground lines or aggregates are conveyed by crane or derrick, or or cables. similar methods, the hooking on, signaling, dump- ing, and unhooking the bucket. Placing of concrete On-site preparation and right-of-way for clearance for or aggregates, whether poured, pumped, gunnited, or construction of any structures or the installation of placed by any other process. The assembly, uncou- traffic and transportation facilities such as highways, pling of all connections and parts of, or to equipment pipelines, electrical transmission lines, dam sites and used in mixing or conveying concrete, aggregate or reservoir areas, access roads, etc. Clearing and slash- mortar, and the cleaning of such equipment, parts ing of brush or trees by hand or with mechanical cut- and/or connections.
10 Cutting of nails, wires, wall ties, ting methods. Blasting for all purposes, such as stumps, carrying and placement and pulling of reinforced rocks, general demolition. Falling, bucking, yarding, rods and mesh, chipping and roughing by hand or loading or burning of all trees or timber on construction any other process, wrecking, stripping, dismantling areas. Choke setters, off bearers, lumber and handlers and handling of concrete forms, pouring, repairing and all laborers connected with on-site portable saw- of sidewalks, driveways, filling stations, parking lots, mill operations connected with clearing. Erection, dis- preparing and grading, tamping of earth and unearth- mantling and/or reinstallation of all fences.