Page 1 of 2 ZD-DC-F-08 issue 6, Rev 1, Dated 14/06/2015 BUILDING PERMIT APPLICATION PLOT NO. CONSULTANT CONTRACTOR SUBMISSION DETAILS INITIAL SUBMISSION RE-SUBMISSION RE-ISSUANCE MODIFICATION RENEWAL FAST TRACK SUBMISSION APPLICATION DETAILS ( PLEASE TICK [ ] THE PERMIT TYPE ) PRELIMINARY BUILDING PERMIT ( PLEASE TICK [ ] THE APPLICABLE ACTIVITIES REQUESTED, AS SHOWN RIGHT ) HOARDING MOBILIZATION EXCAVATION PILING SHORING INTERIM BUILDING PERMIT FOUNDATION SUB-STRUCTURE PODIUM FINAL BUILDING PERMIT NOTE: 1.

Page 1 of 2 ZD-DC-F-08 Issue 6, Rev 1, Dated 14/06/2015 dcca.gov.ae BUILDING PERMIT APPLICATION PLOT NO. CONSULTANT CONTRACTOR SUBMISSION DETAILS

Tags:

  Applications, Building, Issue, Permit, Building permit application

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of BUILDING PERMIT APPLICATION - Dubai Creative …

1 Page 1 of 2 ZD-DC-F-08 issue 6, Rev 1, Dated 14/06/2015 BUILDING PERMIT APPLICATION PLOT NO. CONSULTANT CONTRACTOR SUBMISSION DETAILS INITIAL SUBMISSION RE-SUBMISSION RE-ISSUANCE MODIFICATION RENEWAL FAST TRACK SUBMISSION APPLICATION DETAILS ( PLEASE TICK [ ] THE PERMIT TYPE ) PRELIMINARY BUILDING PERMIT ( PLEASE TICK [ ] THE APPLICABLE ACTIVITIES REQUESTED, AS SHOWN RIGHT ) HOARDING MOBILIZATION EXCAVATION PILING SHORING INTERIM BUILDING PERMIT FOUNDATION SUB-STRUCTURE PODIUM FINAL BUILDING PERMIT NOTE: 1.

2 PLEASE SEE PAGE 2 FOR DOCUMENTS REQUIRED AND REQUESTOR DETAILS TO BE FILLED IN 2. PILING AND SHORING PERMIT SUBMISSION SHALL BE SUBMITTED SEPARATELY FOR Dubai Creative CLUSTERS AUTHORITY USE COMMENT(S): OBJECTION NO OBJECTION NO OBJECTION WITH COMMENTS REVIEWED BY: HSE OPERATIONS STRUCTURAL (IF APPLICABLE) NAME NAME SIGNATURE SIGNATURE DATE DATE AUTHORIZED BY: NAME SIGNATURE DATE STAMP Page 2 of 2 ZD-DC-F-08 issue 6, Rev 1, Dated 14/06/2015 DOCUMENTS REQUIRED PRELIMINARY BUILDING PERMIT HOARDING 1.

3 CONSULTANTS APPOINTMENT LETTER BY THE OWNER (ORIGINAL ON LETTERHEAD) 2. CONTRACTORS APPOINTMENT LETTER BY THE OWNER & CONSULTANT (ORIGINAL ON LETTERHEAD) 3. CONTRACTOR S & CONSULTANT S ACCEPTANCE LETTER (ORIGINAL ON LETTERHEAD) 4. COPY OF CONSULTANT S & CONTRACTOR S PROFESSIONAL LICENSE 5. UNDERTAKING LETTER [REFER TEMPLATE FORM NO. ZD-DC-T- 63] (APPLICABLE FOR HOARDING AND MOBILIZATION ONLY) 6. COPY OF VALID SITE PLAN 7. OUTLINE PROGRAM OF WORK 8. LAYOUT OF PROPOSED HOARDING (2 COPIES, A3 SIZE) INCLUDING COLOR, MATERIAL ETC. 9. HOARDING MATERIAL SHALL BE CORRUGATED STEEL SHEET 10.

4 COPY OF PRELIMINARY DESIGN APPROVAL LETTER 11. APPLICABLE FEE (AS PER FEE MATRIX) MOBILIZATION 1. ORIGINAL HOARDING PERMIT (LATEST) OR ALL DOCUMENTS AS ABOVE 2. LAYOUT OF SITE ALLOCATION WITH ADJACENT PLOT & SIGNBOARD DETAILS (2 SETS, A3 SIZE) 3. SECURITY CHEQUE (AS PER FEE MATRIX) OR REFER TO TEMPLATE FORM NO. ZD-DC-T- 64 FROM CONTRACTOR 4. APPLICABLE FEE (AS PER FEE MATRIX) EXCAVATION 1. ORIGINAL MOBILIZATION PERMIT (LATEST) OR ALL DOCUMENTS MENTIONED IN THE MOBILIZATION SECTION 2. COPY OF THE HSE PASSPORT FOR THE PROJECT MANAGEMENT AND THE HSE TEAM. 3. SLOPE STABILITY CALCULATION (IF APPLICABLE) 4.

5 DETAIL DESIGN DRAWINGS (2 SETS, A1 SIZE) 5. PROJECT HSE PLAN (1 SET, SOFT COPY) STAMPED & SIGNED BY THE COMPANY GM. 6. COPY OF THE HSE PASSPORT FOR THE PROJECT MANAGEMENT T AND THE HSE TEAM 7. APPLICABLE FEE (AS PER FEE MATRIX) SHORING 1. ORIGINAL BUILDING PERMIT (LATEST) OR ALL DOCUMENTS IN THE EXCAVATION SECTION (IF APPLICABLE) 2. APPROVED SOIL REPORT BY Creative CLUSTERS AUTHORITY (SOFT COPY) 3. PROJECT HSE PLAN (1 SETS, SOFT COPY) STAMPED & SIGNED BY THE COMPANY GM. 4. COPY OF SPECIALIZED CONTRACTOR S LICENSE REGISTERED IN Dubai 5. COPY OF THE HSE PASSPORT FOR THE PROJECT MANAGEMENT AND THE HSE TEAM.

6 6. COPY OF PRELIMINARY DESIGN APPROVAL LETTER [NOT APPLICABLE FOR BELOW PERMIT ] 7. DETAILED DESIGN CALCULATIONS (SOFT COPY) & DRAWINGS (2 SETS, HARD COPY A1 SIZE) 8. NOC FROM COASTAL ZONE & WATERWAYS MANAGEMENT SECTION (AS PER DECREE # (22) 2001) [IF APPLICABLE] 9. COPY OF SHORING NOC - INFRASTRUCTURE (FORM NO.: ZD-DC-F- 61) [IF APPLICABLE] 10. SHORING DESIGN REVIEW CHECKLIST (REFER FORM NO.: ZD-DC-F- 77) [IF APPLICABLE] 11. PROJECT DETAILS SHEET (STAMPED & SIGNED BY THE CONSULTANT) 12. APPLICABLE FEE (AS PER FEE MATRIX) PILING 1. ORIGINAL BUILDING PERMIT (LATEST) OR THE DOCUMENTS MENTIONED IN MOBILIZATION & HOARDING SECTION (IF APPLICABLE).

7 2. PILING DESIGN REVIEW CHECKLIST (REFER FORM NO.: ZD-DC-F-80) [IF APPLICABLE] 3. DETAILED DESIGN CALCULATIONS (SOFT COPY) & DRAWINGS (2 SETS, HARD COPY A1 SIZE) 4. COPY OF PRELIMINARY DESIGN APPROVAL LETTER [NOT APPLICABLE FOR BELOW PERMIT ] 5. PROJECT HSE PLAN (1 SETS, SOFT COPY) STAMPED & SIGNED BY THE COMPANY GM. 6. PROJECT DETAILS SHEET (STAMPED & SIGNED BY THE CONSULTANT) 7. COPY OF THE HSE PASSPORT FOR THE PROJECT MANAGEMENT AND THE HSE TEAM. 8. APPLICABLE FEE (AS PER FEE MATRIX) DOCUMENTS REQUIRED INTERIM BUILDING PERMIT FOUNDATION, SUB-STRUCTURE, PODIUM 1.

8 ORIGINAL BUILDING PERMIT (LATEST) OR THE DOCUMENTS MENTIONED IN MOBILIZATION & HOARDING SECTION (IF APPLICABLE) 2. COPY OF FINAL DESIGN (FOR FOUNDATION, SUB-STRUCTURE & PODIUM ) APPROVAL LETTER 3. PROJECT DETAILS SHEET (STAMPED & SIGNED BY THE CONSULTANT) 4. APPLICABLE FEE (AS PER FEE MATRIX) 5. PROJECT HSE PLAN (1 SET, SOFT COPY) STAMPED & SIGNED BY THE COMPANY GM. 6. COPY OF THE HSE PASSPORT FOR THE PROJECT MANAGEMENT AND THE HSE TEAM. DOCUMENTS REQUIRED FINAL BUILDING PERMIT FINAL BUILDING PERMIT 1. VALID SITE PLAN 2. ORIGINAL BUILDING PERMIT (LATEST) OR THE DOCUMENTS MENTIONED IN MOBILIZATION & HOARDING SECTION (IF APPLICABLE) 3.

9 PROJECT HSE PLAN (1 SET, SOFT COPY) STAMPED & SIGNED BY THE COMPANY GM. (IF NOT SUBMITTED PREVIOUSLY) 4. COPY OF THE HSE PASSPORT FOR THE PROJECT MANAGEMENT T AND THE HSE TEAM 5. COPY OF FINAL DESIGN APPROVAL LETTER 6. PROJECT DETAILS SHEET (STAMPED & SIGNED BY THE CONSULTANT) 7. SECURITY CHEQUE (IF NOT SUBMITTED PREVIOUSLY) 8. APPLICABLE FEE (AS PER FEE MATRIX) DOCUMENTS REQUIRED [RE-ISSUANCE, MODIFICATION & RENEWAL OF BUILDING PERMIT ] RE-ISSUANCE, MODIFICATION & RENEWAL 1. ORIGINAL BUILDING PERMIT (IF APPLICABLE) 2. PROJECT DETAILS SHEET (STAMPED & SIGNED BY THE CONSULTANT) (FOR RENEWAL ONLY) 3.

10 APPLICABLE FEE (AS PER FEE MATRIX) REQUESTOR DETAILS NAME SIGNATURE TEL FAX DATE MOBILE STAMP EMAIL