WSDOT bridge Design manual M Page 12-i June 2022 Chapter 12 Quantities, Costs, and Specifications Quantities - General .. Cost Estimating Quantities .. Conceptual Stage .. Preliminary Plan Stage .. Design Final Contract Not Included in bridge Quantities Computation of Design Unit .. bridge Project Support Procedure for Data Source .. Preliminary Final Excavation .. Structure Excavation, Class Special Excavation .. Shoring or Extra Excavation, Class Conduit Private Utilities Attached To bridge Structures .. Drilled Construction Costs .. Factors Affecting Type of Location of Project Size of Project Foundation Sequencing of 12 Quantities, Costs, and SpecificationsPage 12-ii WSDOT bridge Design manual M June Development of Cost Estimates.

WSDOT Bridge Design Manual M 23-50.20 Page 12-1 September 2020. Chapter 12 Quantities, Costs, and Specifications. 12.1 Quantities - General. The quantities of the various materials and work items involved in the construction of

Tags:

  Manual, Bridge, Chapter

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Advertisement

Transcription of Chapter 12 Quantities, Costs, and Specifications Contents

1 WSDOT bridge Design manual M Page 12-i June 2022 Chapter 12 Quantities, Costs, and Specifications Quantities - General .. Cost Estimating Quantities .. Conceptual Stage .. Preliminary Plan Stage .. Design Final Contract Not Included in bridge Quantities Computation of Design Unit .. bridge Project Support Procedure for Data Source .. Preliminary Final Excavation .. Structure Excavation, Class Special Excavation .. Shoring or Extra Excavation, Class Conduit Private Utilities Attached To bridge Structures .. Drilled Construction Costs .. Factors Affecting Type of Location of Project Size of Project Foundation Sequencing of 12 Quantities, Costs, and SpecificationsPage 12-ii WSDOT bridge Design manual M June Development of Cost Estimates.

2 Prospectus and Project Summary Preliminary Design Estimate Updates During Design .. Contract bridge Project Support Unit .. Documentation .. Cost Data .. Deck or Wall Face Area .. bridge Widenings and New bridge Rail Replacement .. bridge Lengths With Unequal Wingwalls .. Retaining Construction Specifications and Standard Specifications .. Mandatory General Special Special AD Copy .. As defined in Standard Specifications Section General bridge S&E Process .. Typical Reviews and Milestone Constructability Review Set Distribution .. PS&E Review Set Reviewing bridge Plans.

3 Job File .. PS&E Check List (Form 230-037 and Appendix ).. Summary of Quantities (Form 230-031 and Appendix ).. Not Included in bridge Quantities List (Form 230-038 and Appendix ).. Geotechnical Report .. Preparing the bridge Cost Estimates .. General .. Procedure ..12-18 Quantities, Costs, and Specifications Chapter 12 WSDOT bridge Design manual M Page 12-iii June Preparing the bridge Specifications .. General .. Procedure .. Preparing the bridge Working Day General .. Procedure .. Reviewing Projects Prepared by General .. Procedure .. Submitting the PS&E General .. PS&E Review Period and Turn-in for AD Description.

4 Procedure .. Not Included In bridge Quantities bridge Structural Estimating Aids Construction Costs ..12-29 Appendix Structural Estimating Aids Construction Costs ..12-31 Appendix Structural Estimating Aids Construction Costs ..12-33 Appendix Structural Estimating Aids Construction Costs ..12-35 Appendix Cost Estimate Summary ..12-36 Appendix Special Provisions Structural Estimating Aids Construction Time Construction Working Day 12 Quantities, Costs, and SpecificationsPage 12-iv WSDOT bridge Design manual M June 2022 This page intentionally left bridge Design manual M Page 12-1 June 2022 Chapter 12 Quantities, Costs, and Quantities - GeneralThe quantities of the various materials and work items involved in the construction of a project that includes bridges and structures are needed for establishing the estimated cost of the project throughout the design process.

5 And for establishing a basis for comparison of the contractor s Cost Estimating QuantitiesQuantities for establishing cost estimates are often necessary during various stages of project development and are required at the completion of the bridge PS&E. These quantities should be calculated from the best information available at the time, see Section The policy regarding the preparation of quantity calculations is as Conceptual StageDuring the conceptual stage of a project, estimated quantities may be required to arrive at an estimated cost. The need for conceptual stage quantities will be determined by the bridge Project Support Preliminary Plan StageUpon completion of the preliminary plan, estimated quantities may be required to arrive at an estimated cost.

6 The need for preliminary plan stage quantities will be determined by the bridge Project Support Design StageIf requested, quantity calculations shall be made, reviewed, and submitted to the bridge Project Support Unit by the bridge Design Unit as the design progresses. The first submittal of estimated quantities shall be made as soon as the major dimensions of the structure are determined. As refinements in the design are made, quantities varying more than 10 percent from those previously submitted shall be Final Contract QuantitiesUpon completion of structural design and plans, the quantities of materials and work items involved in the construction of the project shall be computed.

7 See Sections and Not Included in bridge Quantities ListItems of work which appear in the bridge plan sheets, but for which details, Specifications , and quantities are not included in the bridge PS&E, shall be listed in the Not Included in bridge Quantities List (WSDOT Form 230-038 and Appendix ). This list is required for every bridge , even if no items of work are shown in the Plans that are in this category. (In this case, fill out the bridge information at the top of the form and write NONE across the form.) This form is transmitted to the Region Design PE Office with all Preliminary Plan submittals, all bridge PS&E distributions, and at various milestone points during the design process, to ensure that the responsibility for all PS&E items is clear.

8 Particular care shall be taken in the preparation of this list as omissions can result in an incomplete project PS&E with missing information for work items, or conflicting overlapping information for work 12 Quantities, Costs, and SpecificationsPage 12-2 WSDOT bridge Design manual M June Computation of Design UnitThe Design Unit is responsible for calculating quantities required for cost estimates for Preliminary Plans prepared in Design Units, calculating preliminary quantities at various milestones during the design process, and calculating quantities for the final bridge PS&E. The Design Unit is responsible for notifying the Region Design PE Office and the bridge Project Support Unit whenever structural design changes and alterations are made to the design features and quantities which affect the cost of the structure, especially following the distribution of the initial Preliminary bridge Project Support UnitThe bridge Project Support Unit is responsible for computing quantities for conceptual stage cost estimates, and cost estimates for Preliminary Plans prepared in the bridge Project Support Unit.

9 The bridge Project Support Unit is responsible for ensuring that the quantities listed in the AD Copy Bid Proposal correspond to those received from the Design Procedure for ComputationQuantities are to be computed and checked independently. The designer/originator and checker shall separately summarize their calculated quantities on the bridge Quantities Form 230-031 (See Appendix ) in the units shown thereon. The two summaries shall be submitted to the Design Unit Manager for comparison. The designer/originator and checker shall use identical breakdowns for each quantity. For example, the designer/originator s quantities for excavation for each of Piers 1, 2, and 3 should be compared separately against the corresponding quantities made by the the desired accuracy, see Section , is achieved, a Manager s bridge Quantities form shall be prepared and submitted to the bridge Project Support Unit along with the Pre-Contract Review bridge Plans review set.

10 (This form is the same as previously mentioned except that it is labeled Manager s bridge Quantities and is completed by the Design Unit Manager or designee. If the Design Unit Manager elects, the designer/originator s or the checker s bridge Quantities form may be designated as Supervisor s bridge Quantities. ) This form is used by the bridge Project Support Unit to prepare the final bridge cost quantity calculations and bridge quantities forms are to be filed in the job file for the structure or the PS&E file for the project. All subsequent revisions shall be handled in the same manner as the original quantities. On the bridge Quantities form, any revision to the original figure should not be erased but crossed out and replaced by the new figure using a different colored pencil.