Highway surveying Manual Page 15-1 January 2005 Chapter 15 Construction Survey Procedures15-01 GeneralIn performing Construction surveying , preparation is a major part of the operation. Study the contract plans, special provisions, Standard Plans, Standard Specifications, the plan quantities, Construction Manual, and the contractor s proposal. Take appropriate measures to protect existing monuments. (See Chapter 16 Monumentation and Survey Records ).Features may be staked directly from the highway center line by station and offset, or they may be staked from some other control point that is more convenient.

Highway Surveying Manual Page 15-1 January 2005 Chapter 15 Construction Survey Procedures 15-01 General In performing construction surveying, preparation is a major part of the operation.

Tags:

  Construction, Survey, Surveying, Construction survey

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Chapter 15 Construction Survey Procedures

1 Highway surveying Manual Page 15-1 January 2005 Chapter 15 Construction Survey Procedures15-01 GeneralIn performing Construction surveying , preparation is a major part of the operation. Study the contract plans, special provisions, Standard Plans, Standard Specifications, the plan quantities, Construction Manual, and the contractor s proposal. Take appropriate measures to protect existing monuments. (See Chapter 16 Monumentation and Survey Records ).Features may be staked directly from the highway center line by station and offset, or they may be staked from some other control point that is more convenient.

2 Depending on the type of work to be performed by the contractor, stakes may be set to mark the actual work, such as clearing limits, or they may be offset in staking completing a staking operation, look at the stakes to be sure that they are in a uniform line if they should be. Double Checking is the most important part of Construction surveying . Check everything that is staked and always have another member of the crew double check any calculations that someone has made. Always visually check field staking making sure it looks correct.

3 If your not sure, check it out. Many errors can be caught beforehand or eliminated if the Survey crew stays aware and questions anything that looks out of the ordinary. Review cuts or fills recorded on the stakes to ensure that they agree with the addition to Field Note Records (which are kept as documentation for payments to the contractor), computer printouts, and cross section notes, keep a field book to record alignment, references, control points, slope stake data, drainage computations, and other information. A Surveyors Daily Report should be made denoting all work completed for the day.

4 (DOT Form 237-010 EF). Included in this Chapter are five phases of Construction for many WSDOT projects. They are: Earthwork and Surfacing Drainage Structure layout Miscellaneous Construction Post Construction surveying WSDOT Standard Color Codes Equipment Table15-02 Earthwork and SurfacingAs the Construction work progresses, the Survey crew is usually involved in the following stages: Clearing and Grubbing Slope Staking Grade ControlPage 15-2 Highway surveying Manual January 2005 Construction Survey Procedures Highway surveying Manual Page 15-3 January 2005 Construction Survey Clearing and GrubbingAfter Aesthetic and Environmental concerns are addressed.

5 Clearing and Grubbing stakes are set to mark the limits of disposal of all unwanted material from the surface (clearing) and underground (grubbing). This prepares the project for other staking and Construction activities. See Chapter 2-1 of the Construction the Construction center line as the reference line for setting clearing stakes. Set stakes (lath) at least 4 feet long, marked Clearing, at the offset, marking the limits of the area to be cleared. Where slope treatment is to be provided, clearing normally is staked 10 feet beyond the limits of the slope treatment with 5 feet minimum.

6 Do not set grading stakes until clearing and grubbing work is completed. Refer to the Standard Specifications, Section staking for clearing and grubbing, the party chief prepares a Field Note Record, WSDOT Form 422-636EF (Figure 15-1). Complete the heading. In the sketch grid area, show center line, stations, and limits of clearing and grubbing. Include a north arrow. Do not try to draw to scale, as an exaggerated scale makes the note easier to read. Use a straightedge for straight lines. Gaps that require no work and isolated areas that require work should be staked in accordance to the Standard Specifications in Section Figure 15-1 Field Notes for Clearing and Grubbing Page 15-2 Highway surveying Manual January 2005 Construction Survey Procedures Highway surveying Manual Page 15-3 January 2005

7 Construction Survey Slope StakingSlope staking is a trial and error process of finding the point where the slope intercepts the natural ground. This point is referred to as the catch point or slope catch. The information needed to set slope stakes is obtained from the contract plans and the computer generated slope stake notes which includes: Profile grade elevation. Traveled way cross slopes and lane widths. Shoulder slopes and widths. Side slopes, cut or fill. Ditch inslopes, back slopes, and depths.

8 Total depth of surfacing 15-2A Computer Generated Slope Stake Notes Also see Figure 15-2B for an example of hand written slope stake 15-4 Highway surveying Manual January 2005 Construction Survey Procedures Highway surveying Manual Page 15-5 January 2005 Construction Survey ProceduresFigure 15-2B Hand Written Generated Slope Stake NotesThere are various ways to slope stake a project, depending on which method you choose.

9 They are listed as follows: Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. Conventional Method - Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. Modified Conventional Method - Slope staking using a total station and data collector, using the slope staking program in the data collector by inputting design templates, horizontal and vertical alignments and super elevation rates. Or by User Defined process entering pivot offset, pivot elevation and slope ratios for desired station.

10 GPS/RTK Method - Slope staking using a base station and rovers with data collectors by loading a design Digital Terrain Model (DTM). This method slope stakes off the DTM surface and immediately calculates the catch allowing you to walk right to the actual catch point. Or by User Defined process entering pivot offset, pivot elevation and slope ratios for desired 15-4 Highway surveying Manual January 2005 Construction Survey Procedures Highway surveying Manual Page 15-5 January 2005 Construction Survey ProceduresFigure 15-2C Distance From Finished Shoulder to Subgrade Shoulder and Slope