Example: air traffic controller
CHAPTER 7. CULVERT AND BRIDGE HYDRAULIC DESIGN
interval, and the culvert is designed to operate within acceptable limits of risk at that flow rate. The design recurrence interval shall be based on the criteria set forth in Section 3.1.1 of this chapter. Peak discharge rates for the design storm can be calculated using design methods described in Chapter 4 – Determination of Stormwater Runoff.
Tags:
Information
Domain:
Source:
Link to this page: