Example: confidence
DETENTION FACILITY DESIGN AND ANALYSIS
per Section 5.1.3 (p. 5-24); (b) a fence is provided along the top of the wall; (c) at least 25% of the pond perimeter will be a vegetated soil slope not steeper than 3H:1V; and (d) the design is stamped by a licensed structural civil engineer. 4. For . privately owned and maintained facilities, the entire pond perimeter may be retaining walls, and
Tags:
Information
Domain:
Source:
Link to this page: