Directive 020: Well Abandonment - Alberta Energy Regulator
level-A interval), an additional cement plug must be circulated on top of the uppermost previously abandoned zone. This cement plug must be a minimum length of 30 vertical metres and have a minimum volume of 1 m 3. The base of this plug must be located below the base of groundwater protection ( BGWP).
Tags:
Directive, Well, Cement, Abandonment, Directive 020, Well abandonment
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Directive 088: Licensee Life-Cycle Management
static.aer.caDirective 088: Licensee Life-Cycle Management (December 2021) 5. 5) Each licensee must report to the AER all its closure activities and closure spends for the previous calendar year by March 31 of every year, or as otherwise directed by the AER. 6) Each licensee must keep complete and accurate records of its closure activities and spending.
Directive 036: Drilling Blowout Prevention Requirements ...
static.aer.caDirective 036: Drilling Blowout Prevention Requirements and Procedures (March 2019) i. Release date: March 14, 2019 Effective date: March 14, 2019 Replaces previous edition issued January 31, 2018. Drilling Blowout Prevention Requirements and Procedures . Contents
Directive 087: Well Integrity Management
static.aer.catubing, casing, packer seal, or wellhead seal assembly; meet the minimum pressure and duration requirements specified in table 1 when pressure …
Management, Requirements, Directive, Well, Minimum, Wellhead, Integrity, Directive 087, Well integrity management
Manual 023: Licensee Life-Cycle Management
static.aer.caLiability Management Program s) and the licensee’s abandonment, remediation, and reclamation liabilities (as determined using . Directive 011: Licensee Liability Rating (LLR) Program: Updated Industry Parameters and Liability Costs). Magnitude of liability is either low, medium, or high. The thresholds are as follows: •
Programs, Liability, Directive, Ratings, Licensee, Directive 011, Licensee liability rating
Directive 017: Measurement Requirements for Oil and Gas ...
static.aer.caDirective 017: Measurement Requirements for Oil and Gas Operations (May 2020) i Directive 017 . Release date: May . 12, 2020 Effective date: May . 12
Requirements, Measurement, Directive, Directive 017, Measurement requirements for oil
Directive 067: Eligibility Requirements for Acquiring and ...
static.aer.cathe types of licences or approvals that may be held, ... operating of the well, pipeline, or facility and about implementing the directions of the AER ... Applications that do not include the required fee will be summarily closed. 4.4 Financial Information Financial statements and financial summary (Schedule 3) will be used by the AER to ...
Directive 056: Energy Development Applications and …
static.aer.caDirective 056: Energy Development Applications and Schedules (May 2021) i. Release date: May 18, 2021 Effective date: May 18, 2021 Replaces previous edition issued March 25, 2021 . Energy Development Applications and Schedules . Contents
Development, Applications, Schedule, Directive, Energy, Directive 056, Energy development applications and, Energy development applications and schedules
Directive 051: Injection and Disposal Wells (1994-03 ...
static.aer.caRequirements for Activities within the Boundary of a Regional Plan or e-mail . regional.plans@aer.ca. This bulletin rescinds and replaces Bulletin 2012-22: Application Procedures for Approval of Activities Located In or Near the Boundaries of the Lower Athabasca Regional Plan, which is an earlier bulletin that was issued regarding the AER’s
Lower, Plan, Regional, Lower athabasca regional plan, Athabasca, Plan regional
Directive 060: Upstream Petroleum Industry Flaring ...
static.aer.caAlberta Energy Regulator . 2 Directive 060: Upstream Petroleum Industry Flaring, Incinerating, and Venting (April 2021) 2.11.1 Limitations on Nonroutine …
Related documents
Installation Guide - Fiber Cement Products
www.jameshardiepros.com• Avoid using resin, rosin or cement-coated fasteners that can discolor vinyl flooring. 2 | Patch • Use the cement-based, rapid-setting patching compound recommended by the floor covering manufacturer. • Do not use a gypsum-based patch. Follow the patch manufacturer’s instructions. Preparation for Underlayment
CONSTRUCTION SPECIFICATION FOR HOT MIX ASPHALT
www.walkerind.comPerformance Graded Asphalt Cement (PGAC) means an asphalt binder that is an asphalt-based cement produced from petroleum residue, either with or without the addition of non-particulate modifiers, according to AASHTO M320. Quality Assurance (QA) means a system or series of activities carried out by the Owner to ensure that
TM Underlayment and Tile Backerboard Installation Guide
www.usg.combe designed (based on stud properties alone) not to exceed L/360 deflection for tile, L/240 for surfaces that will be painted. Maximum fastener spacing: 8" o.c. for wood and steel framing; 6" o.c. for ceiling applications. – Patching Compound Use a high-quality patching compound such as USG Durock ™ Fast Finish Floor Patch or equivalent
MASTER SPECIFICATIONS Division 22 PLUMBING
www.northwestern.eduA. Refer to applicable Division 01 Section covering cutting and patching and applicable Division 02 Section covering selective structure demolition for general demolition requirements and procedures. B. If pipe, insulation, or equipment to remain is damaged in …