Board of Rules and AppealsFBC 6th Edition ( 2017 )- Plumbing - Supplement No. 1 January 1, 2018 Broward County Board of Rules and AppealsOne North University Drive Suite 3500 B, Plantation, Florida 33324 - Phone: 954 -765-4500 Website: Building Code 6th Edition ( 2017 ) PlumbingBroward County EditionLoose-leaf SupplementInsert and maintain this instruction sheet in front of the Florida Building Code, 6th Edition ( 2017 ) removed pages for - Remove Old PagesPlumbing - Insert New PagesChapter 3 - Page 15 - 16&KDSWHU 6 3 DJH 35 - 36 Chapter 6 - Page 37 - 38 APPENDIX F - Page 155 - 156 APPENDIX F - Page 159 - 160 APPENDIX F - Page 161 - 162 APPENDIX F - Page 163 - 164 Chapter 3 - Page 15 - 16&KDSWHU 6 3 DJH 35- 36 Chapter 6 - Page 37- 38 APPENDIX F - Page 155 - 156 APPENDIX F - Page 159 - 160 APPENDIX F - Page 161 - 162 APPENDIX F - Page 163 - 164 Highlight of changes.

FLORIDA BUILDING CODE — PLUMBING, 6th EDITION (2017) 35 CHAPTER 6 WATER SUPPLY AND DISTRIBUTION SECTION 601 GENERAL 601.1 Scope. This chapter shall govern the materials, design and installation of water supply systems, both hot and cold, for utilization in connection with human occupancy and habi-

Tags:

  2017, Edition, Building, Florida, Florida building

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Florida Building Code 6 Edition (2017) Plumbing

1 Board of Rules and AppealsFBC 6th Edition ( 2017 )- Plumbing - Supplement No. 1 January 1, 2018 Broward County Board of Rules and AppealsOne North University Drive Suite 3500 B, Plantation, Florida 33324 - Phone: 954 -765-4500 Website: Building Code 6th Edition ( 2017 ) PlumbingBroward County EditionLoose-leaf SupplementInsert and maintain this instruction sheet in front of the Florida Building Code, 6th Edition ( 2017 ) removed pages for - Remove Old PagesPlumbing - Insert New PagesChapter 3 - Page 15 - 16&KDSWHU 6 3 DJH 35 - 36 Chapter 6 - Page 37 - 38 APPENDIX F - Page 155 - 156 APPENDIX F - Page 159 - 160 APPENDIX F - Page 161 - 162 APPENDIX F - Page 163 - 164 Chapter 3 - Page 15 - 16&KDSWHU 6 3 DJH 35- 36 Chapter 6 - Page 37- 38 APPENDIX F - Page 155 - 156 APPENDIX F - Page 159 - 160 APPENDIX F - Page 161 - 162 APPENDIX F - Page 163 - 164 Highlight of changes.

2 Modification to section [M] to section Modification to table to Appendix F - page to Appendix F - page to Appendix F - page to Appendix F - page 164 This page is intentionally left blank.'%.%2!, 2%'5,!4)/.3&,/2)$! "5),$).' #/$% 0,5-").' TH %$)4)/. 3%#4)/. 7!3(2//- !.$ 4/),%4 2//- 2%15)2%-%.43 ,IGHT AND VENTILATION 7 ASHROOMS AND TOILET ROOMSSHALL BE ILLUMINATED AND VENTILATED IN ACCORDANCE WITH THE&LORIDA "UILDING #ODE "UILDING AND &LORIDA "UILDING #ODE -ECHANICAL ,OCATION OF FIXTURES AND COMPARTMENTS 4HE LOCATIONOF Plumbing FIXTURES AND THE REQUIREMENTS FOR COMPARTMENTSAND PARTITIONS SHALL BE IN ACCORDANCE WITH 3 ECTION )NTERIOR FINISH )NTERIOR FINISH SURFACES OF TOILET ROOMSSHALL COMPLY WITH THE &LORIDA "UILDING #ODE "UILDING 3%#4)/.

3 4/),%4 &!#),)4)%3 &/2 7/2+%23 'ENERAL 4 OILET FACILITIES SHALL BE PROVIDED FOR CON STRUCTION WORKERS AND SUCH FACILITIES SHALL BE MAINTAINED IN ASANITARY CONDITION #ONSTRUCTION WORKER TOILET FACILITIES OF THENONSEWER TYPE SHALL CONFORM TO !.3) : 3%#4)/. 4%343 !.$ ).30%#4)/.3 2 EQUIRED TESTS 4HE PERMIT HOLDER SHALL MAKE THEAPPLICABLE TESTS PRESCRIBED IN 3 ECTIONS THROUGH TO DETERMINE COMPLIANCE WITH THE PROVISIONS OF THIS CODE 4 HEPERMIT HOLDER SHALL GIVE REASONABLE ADVANCE NOTICE TO THECODE OFFICIAL WHEN THE Plumbing WORK IS READY FOR TESTS 4 HEEQUIPMENT MATERIAL POWER AND LABOR NECESSARY FOR THEINSPECTION AND TEST SHALL BE FURNISHED BY THE PERMIT HOLDERAND HE OR SHE SHALL BE RESPONSIBLE FOR DETERMINING THAT THEWORK WILL WITHSTAND THE TEST PRESSURE PRESCRIBED IN THE FOLLOW ING TESTS !

4 LL Plumbing SYSTEM PIPING SHALL BE TESTED WITHEITHER WATER OR FOR PIPING SYSTEMS OTHER THAN PLASTIC BY AIR !FTER THE Plumbing FIXTURES HAVE BEEN SET AND THEIR TRAPSFILLED WITH WATER THE ENTIRE DRAINAGE SYSTEM SHALL BE SUBMIT TED TO FINAL TESTS 4HE CODE OFFICIAL SHALL REQUIRE THE REMOVALOF ANY CLEANOUTS IF NECESSARY TO ASCERTAIN WHETHER THE PRES SURE HAS REACHED ALL PARTS OF THE SYSTEM 4 EST GAUGES 'AUGES USED FOR TESTING SHALL BE ASFOLLOWS 4 ESTS REQUIRING A PRESSURE OF POUNDS PER SQUAREINCH PSI K0A OR LESS SHALL UTILIZE A TESTINGGAUGE HAVING INCREMENTS OF PSI K0A ORLESS 4 ESTS REQUIRING A PRESSURE OF GREATER THAN PSI K0A BUT LESS THAN OR EQUAL TO PSI K0A SHALLUTILIZE A TESTING GAUGE HAVING INCREMENTS OF PSI K0A OR LESS 4 ESTS REQUIRING A

5 PRESSURE OF GREATER THAN PSI K0A SHALL UTILIZE A TESTING GAUGE HAVING INCRE MENTS OF PSI K0A OR LESS $RAINAGE AND VENT WATER TEST ! WATER TEST SHALL BEAPPLIED TO THE DRAINAGE SYSTEM EITHER IN ITS ENTIRETY OR IN SEC TIONS )F APPLIED TO THE ENTIRE SYSTEM ALL OPENINGS IN THE PIP ING SHALL BE TIGHTLY CLOSED EXCEPT THE HIGHEST OPENING ANDTHE SYSTEM SHALL BE FILLED WITH WATER TO THE POINT OF OVERFLOW )F THE SYSTEM IS TESTED IN SECTIONS EACH OPENING SHALL BETIGHTLY PLUGGED EXCEPT THE HIGHEST OPENINGS OF THE SECTIONUNDER TEST AND EACH SECTION SHALL BE FILLED WITH WATER BUT NOSECTION SHALL BE TESTED WITH LESS THAN A FOOT MM HEADOF WATER )N TESTING SUCCESSIVE SECTIONS AT LEAST THE UPPER FEET MM OF THE NEXT PRECEDING SECTION SHALL BE TESTEDSO THAT NO JOINT OR PIPE IN THE Building EXCEPT THE UPPERMOST FEET MM OF THE SYSTEM SHALL HAVE BEEN SUBMITTEDTO A TEST OF LESS THAN A FOOT MM HEAD OF WATER 4 HISPRESSURE SHALL BE HELD FOR NOT LESS THAN MINUTES 4HE SYS TEM SHALL THEN BE TIGHT AT ALL POINTS $RAINAGE AND VENT AIR TEST 0 LASTIC PIPING SHALL NOT BETESTED USING AIR !

6 N AIR TEST SHALL BE MADE BY FORCING AIR INTOTHE SYSTEM UNTIL THERE IS A UNIFORM GAUGE PRESSURE OF PSI K0A OR SUFFICIENT TO BALANCE A INCH MM COL UMN OF MERCURY 4 HIS PRESSURE SHALL BE HELD FOR A TEST PERIODOF NOT LESS THAN MINUTES !NY ADJUSTMENTS TO THE TEST PRES SURE REQUIRED BECAUSE OF CHANGES IN AMBIENT TEMPERATURES ORTHE SEATING OF GASKETS SHALL BE MADE PRIOR TO THE BEGINNING OFTHE TEST PERIOD $RAINAGE AND VENT FINAL TEST 4HE FINAL TEST OF THECOMPLETED DRAINAGE AND VENT SYSTEMS SHALL BE VISUAL AND INSUFFICIENT DETAIL TO DETERMINE COMPLIANCE WITH THE PROVISIONSOF THIS CODE 7 HERE A SMOKE TEST IS UTILIZED IT SHALL BE MADEBY FILLING ALL TRAPS WITH WATER AND THEN INTRODUCING INTO THEENTIRE SYSTEM A PUNGENT THICK SMOKE PRODUCED BY ONE ORMORE SMOKE MACHINES 7 HEN THE SMOKE APPEARS AT STACKOPENINGS ON THE ROOF THE STACK OPENINGS SHALL BE CLOSED AND APRESSURE EQUIVALENT TO A INCH WATER COLUMN 0A

7 SHALLBE HELD FOR A TEST PERIOD OF NOT LESS THAN MINUTES 7 ATER SUPPLY SYSTEM TEST 5 PON COMPLETION OF A SEC TION OF OR THE ENTIRE WATER SUPPLY SYSTEM THE SYSTEM OR POR TION COMPLETED SHALL BE TESTED AND PROVED TIGHT UNDER A WATERPRESSURE NOT LESS THAN THE WORKING PRESSURE OF THE SYSTEM OR FOR PIPING SYSTEMS OTHER THAN PLASTIC BY AN AIR TEST OF NOT LESSTHAN PSI K0A 4 HIS PRESSURE SHALL BE HELD FOR NOT LESSTHAN MINUTES 4HE WATER UTILIZED FOR TESTS SHALL BE OBTAINEDFROM A POTABLE SOURCE OF SUPPLY 4HE REQUIRED TESTS SHALL BEPERFORMED IN ACCORDANCE WITH THIS SECTION AND 3 ECTION 'RAVITY SEWER TEST 'RAVITY SEWER TESTS SHALL CONSIST OFPLUGGING THE END OF THE Building SEWER AT THE POINT OF CONNEC TION WITH THE PUBLIC SEWER FILLING THE Building SEWER WITHWATER TESTING WITH NOT LESS THAN A FOOT MM HEAD OFWATER AND MAINTAINING SUCH PRESSURE FOR MINUTES &ORCED SEWER TEST &ORCED SEWER TESTS SHALL CONSIST OFPLUGGING THE END OF THE Building SEWER AT THE POINT OF CONNEC TION WITH THE PUBLIC SEWER AND APPLYING A PRESSURE OF PSI K0A GREATER THAN THE PUMP RATING AND MAINTAINING SUCHPRESSURE FOR MINUTES 3 TORM DRAINAGE SYSTEM TEST 3 TORM DRAIN SYSTEMSWITHIN A Building SHALL BE TESTED BY WATER OR AIR IN ACCORDANCEWITH 3 ECTION OR 3 HOWER LINER TEST 7 HERE SHOWER FLOORS AND RECEPTORSARE MADE WATER TIGHT BY THE APPLICATION OF MATERIALS REQUIREDBY 3 ECTION THE COMPLETED LINER INSTALLATION SHALL

8 BETESTED 4HE PIPE FROM THE SHOWER DRAIN SHALL BE PLUGGED WATERTIGHT FOR THE TEST 4HE FLOOR AND RECEPTOR AREA SHALL BE FILLEDWITH POTABLE WATER TO A DEPTH OF NOT LESS THAN INCHES GENERAL REGULATIONS16mm) measured at the threshold. Where a threshold of at least2 inches (51 mm) high does not exist, a temporary thresholdshall be constructed to retain the test water in the lined flooror receptor area to a level not less than 2 inches (51 mm) deepmeasured at the threshold. The water shall be retained for atest period of not less than 15 minutes, and there shall not beevidence of Inspection and testing of backflow preventionassemblies. Inspection and testing shall comply with Sec-tions and Inspections.

9 Inspections shall be made of allbackflow prevention assemblies and air gaps to determinewhether they are Testing. Reduced pressure principle, doublecheck, pressure vacuum breaker, reduced pressure detectorfire protection, double check detector fire protection, andspill-resistant vacuum breaker backflow preventer assem-blies and hose connection backflow preventers shall betested at the time of installation and immediately afterrepairs or relocation. The testing procedure shall be per-formed in accordance with one of the following stan-dards: ASSE 5013, ASSE 5015, ASSE 5020, ASSE 5047,ASSE 5048, ASSE 5052, ASSE 5056, CSA orCSA General. Equipment efficiencies shall be in accor-dance with the Florida Building Code, Energy 314 CONDENSATE DISPOSAL[M] Fuel-burning appliances.

10 Liquid combustion by-products of condensing appliances shall be collected and dis-chargedto an approved Plumbing fixture or disposal area in accordance withthe m anufacturer s instructions. Condensate piping shall be ofapproved corrosion-resistant material and shall not be smaller thanthe drain connection on the appli-ance. Such piping shall maintain ahorizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal (1-percent slope).[M] Evaporators and cooling coils. Condensate drainsystems shall be provided for equipment and appliances con-tainingevaporators or cooling coils. Condensate drain sys-tems shall bedesigned, constructed and installed in ac cordance withSections through [M] Condensate drainage collection, use or from all cooling coils and evaporators of equipmentserved by an onsite cooling tower in a Building or structurewherein the aggregate cooling capacity of the equipmentexceeds 65,000 Btu/hr shall be collected and conveyed from thedrain pan outlet and discharged to the cooling tower.