Government Of India Ministry of Power Central …

Government Of IndiaMinistry of PowerCentral electricity AuthorityNew DelhiPower SectorSep-2017 SNSection A - Highlights of Power SectorPage1 electricity Generation for Sept 2017 (BU)1A & 1B2 Generating Capacity Addition for Sept 2017 (MW)23 List of Projects Commissioned in Sept 201734 All India Installed Capacity (MW) Region-wise as on India Installed Capacity (MW) Sector-wise as on Lines Added during Sept 2017 (Ckms)57 Transformation Capacity Addition during Sept 2017 (MVA)68 Power Supply Position (Energy & Peak) in Sept 201779 Peak Shortage of Power Supply (MW) in Different Regions 8-910 All India PLF Sector-wise for Sept 20171011T & D and AT & C Losses (%)12 All India Village Electrification & Pumpsets Energised as on cost of Power & Average RealisationSep-1714 All India per capita consumption of electricity (KWh)15 All India Coal consumption for Power Generation (MT)1 Capacity Addition Targets and Achievements in 12th Plan122 Capacity Addition Targets & Achievements during Sept 2017133 Installed Capacity in various Regions including their and Achievements of Transmission Lines in Sept

Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Sep-2017. SN Section A - Highlights of Power Sector Page ... 7 Status of Hydro Schemes Cleared by the CEA upto Sept 2017 1 Rate of sale of power for the year 2014-2015 33-41 Section H - Rate of sale of power for the year 2014-2015 ...

Tags:

  Central, India, Government, Authority, Electricity, Government of india, Central electricity authority

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Government Of India Ministry of Power Central …

1 Government Of IndiaMinistry of PowerCentral electricity AuthorityNew DelhiPower SectorSep-2017 SNSection A - Highlights of Power SectorPage1 electricity Generation for Sept 2017 (BU)1A & 1B2 Generating Capacity Addition for Sept 2017 (MW)23 List of Projects Commissioned in Sept 201734 All India Installed Capacity (MW) Region-wise as on India Installed Capacity (MW) Sector-wise as on Lines Added during Sept 2017 (Ckms)57 Transformation Capacity Addition during Sept 2017 (MVA)68 Power Supply Position (Energy & Peak) in Sept 201779 Peak Shortage of Power Supply (MW) in Different Regions 8-910 All India PLF Sector-wise for Sept 20171011T & D and AT & C Losses (%)12 All India Village Electrification & Pumpsets Energised as on cost of Power & Average RealisationSep-1714 All India per capita consumption of electricity (KWh)15 All India Coal consumption for Power Generation (MT)1 Capacity Addition Targets and Achievements in 12th Plan122 Capacity Addition Targets & Achievements during Sept 2017133 Installed Capacity in various Regions including their and Achievements of Transmission Lines in Sept 2017 2 List of Transmission Lines Commissioned/Ready for commissioning during Sept 20171 Programme and Achievements of Sub-Stations in Sept 20172 List of Sub Stations commissioned/ready for commisssioning during Sept 20171 electricity Generation (MU)

2 Targets and Achievements for 2016-17 221 Power Supply Position (Provisional) for Sept 2017232 Peak Demand and Peak Met (Provisional) for Sept 2017243 Power Supply Position (Revised) for Aug 2017254 Peak Demand and Peak Met (Revised) for Aug 2017265 Notified Power cuts / Restrictions on Industries during Sept 2017276 Power Supply to Agricultural Sector during Sept 2017281 Growth of Installed Capacity since 6th Plan292 Growth of Transmission Sector since 6th Plan303 All India Yearly Coal consumption for Power Generation (Utilities)4 All India Annual Per Capita Consumption of electricity since 20065 Average cost of Power supply & Average realisation (Paisa/kwh)6 Growth of Rural Electrification & Pump Sets Energisation7 Status of Hydro Schemes Cleared by the CEA upto Sept 20171 Rate of sale of Power for the year 2014-201533-41 Section H - Rate of sale of Power for the year 2014-2015 Executive Summary for the Month of Sept 20173211202131 Section B - Capacity Addition Section C - Transmission Lines Section D - Sub StationsSection E - electricity GenerationSection F - Power supply positionContentsSection G - Growth of Power SectorSNContentsPage1 electricity Generation (Conventional Sources) for Sep 2017 (BU)12 Generating Capacity Addition for Sep 2017 (MW)23 List of Projects Commissioned in Sep 201734 All India Installed Capacity (MW) Region-wise as on India Installed Capacity (MW)

3 Sector-wise as on Lines Added during Sep 2017 (Ckms)57 Transformation Capacity Addition during Sept 2017 (MVA)68 Power Supply Position (Energy & Peak) in Sept 201779 Peak Shortage of Power Supply (MW) in Different Regions 8-910 All India PLF Sector-wise for Sept 20171011T & D and AT & C Losses (%)12 All India Village Electrification & Pumpsets Energised as on ####13 Average cost of Power & Average Realisation####14 All India per capita consumption of electricity (KWh)15 All India Coal consumption for Power Generation (MT) Section A - Highlights of Power ###TypeThermalHydroNuclearBhutan ImportAll Sept '16 Sept '17 Change electricity Generation During April 2016 to Sept 2016 & April 2017 to Sept 2017 (BU) electricity Generation for Sep, 2017 (BU)Sep-17 TypeAchievementSep-16 Targets% Change Sept '16 Sept '17 MonthGeneration from Conventional SourcesGeneration from Renewable SourcesTotal Generation from Conventional SourcesGeneration from Renewable SourcesTotal Growth in Conventional GenerationGrowth in Renewable GenerationGrowth in Total Generation(MU)(MU)(MU)(MU)(MU)(MU)(%)(%) (%)Apr-17103,1606,932110,09299,3455,0821 04, ,2958,666115,96199,9036,820106, ,52510,228107,75397,3268,118105, ,91212,928110,84096,4429,554105, ,60610,857105,46395,2379,571104, SolarBiomassBagasseSmall Generation From Renewable (source wise)

4 April- Aug, 2017 vis- -vis April-Aug, 2016 electricity Generation (Conventional & Renewable Sources)April, 2017- Aug, 2017 vis- -vis April, 2016- Aug, 2016 All Figure in MUSource-Wise All India Generation from RenwablesFor the Month ofCommulative value for the periodAug, 2017 Aug, 2016 Aug,2017 Aug ,2016 Generation (April, 2016- Aug, 2016)Generation (April, 2017-Aug, 2017)% #Apr -16 to Apr -17 to Sep -17% Generating Capacity Addition for Sep, 2017 (MW)Generating Capacity Addition during April '16 to Sept' 16 & April '17 to Sept' 17 (MW)% Change -16 to Apr -17 to Sep -17(i) Thermal(ii)(iii)NuclearHydroRESG rand : Captive Genaration is not included in the total. RES as on List of Projects Commissioned During Sep 20174.

5 All India Installed Capacity (MW) Region-wise as on TPP U-3,( 360) MW was Commissioned on HEP ,U-1 (50 MW) was Commissioned on TPP U-1,(150) MW was Commissioned on HEP ,U-2 (50 MW) was Commissioned on = ## All India Installed Capacity (MW) Sector-wise as on TotalTHERMALN uclearHydroRESRES as on , , 31%Private, , 44% Central , , 25%All India Installed Capacity(MW) as on 30-09-2017 (Sector-Wise)Voltage Level+/- 500 KV HVDC+/- 800 KV HVDC765 KV400 KV220 KVAll IndiaSep-17 Voltage Level+/- 500 KV HVDC+/- 800 KV HVDC765 KV400 KV220 KVAll India5257406. Transmission Lines Added during Sep, 2016 (Ckms)Sep-16 Sep-170000204001038187724843859002315 Transmission Lines Added during Apr '15 to Sep '16 & Apr '16 to Sep'17 (Ckms)Apr '15 - Sep'16 Apr '16 - Aug '173566182715141125512574036232046537886 7815141125510200040006000800010000120001 400016000ckms Apr '15 to Sep 16 Apr '16 to Sep 1759002315010002000300040005000600070001 ckmsSep'16 Sep '17 Voltage Level+/- 800 KV HVDC+/- 500 KV HVDC765 KV400 KV220 KVAll IndiaVoltage Level+/- 800 KV HVDC+/- 500 KV HVDC765 KV400 KV220 KVAll India67.

6 Transformation Capacity Addition During Sep, 2017 (MVA)04500458594001500 Sep-16 Sep-1710025021455975150083015003000 All India Transformation Capacity Addition during Apr '16 to Sep '16 & Apr '17 to Sep'17 (MVA)42065010000204458620374601350015420 70400 April' 16 to Sep '16 April '16 to Sep '17100255975020004000600080001000012000 MVAT ransformation Capacity Addition during Sep 2017 Sep-16 Sep-1737460420650745201 MVAA pril' 16 to Sep '16 April '16 to Sep '17 Sep'16 Sep 17 Sep '16 Sep' '17 Northern 3334234,4333267133, 2812429,4102812029, ,7962465524, 1113611,2041105211, Eastern 13731,40713361, India98634101,24997834100, 16 Aug 17 Aug 16 Aug 17 Jun16 Jun. '17 Northern ## Eastern Power Supply Position (Energy & Peak) in Aug 2017 Peak DemandPeak MetRequirementAvailabilityEnergy (MU)RegionDeficit (%)Deficit (%)RegionPower (MW)ChandigarhDelhiHaryanaHPJ&KPunjabRaj asthanUPUtrakhandSep '1604004940017260 Sep '170015005410021050##ChattisgarhGujaratM PMaharashtraDaman & DiuDadar Nagar HaveliSep '1640177000 Sept '1735202063001 APTelenganaKarnatakaKeralaTamil NaduPuducherryLakshyadeepSep'16120707710 Sep '17034412345089.

7 Peak Shortage of Power Supply (MW) in Different Regions001500541002105004004940017260040 08001200160020002400 ChandigarhDelhiHaryanaHPJ&KPunjabRajasth anUPUtrakhandMWNorthern States (MW)Sep '17 Sep '1635202063001401770000500 ChattisgarhGujaratMPMaharashtraDaman &DiuDadarNagarHaveliMWWestern States (MW)Sept '17 Sep '1603441234501207077100100 APTelenganaKarnatakaKeralaTamil NaduPuducherryLakshyadeepSouthern State (MW)Sep '17 Sep'16 BiharDVCJ harkhandOdishaWest BengalSikkimA&N IslandSep '162190000568 Sep '170000004 ArunachalAssamManipurMeghalayaMizoramNag alandTripuraSep '1674030120 Sep '177521026090000004219000056805010015020 0250 BiharDVCJ harkhandOdishaWestBengalSikkimA&NIslandM WEastern States (MW)Sep '17 Sep '16752102607301200100 ArunachalAssamManipurMeghalayaMizoramNag alandTripuraMWNorth-Eastern States (MW)SectorSep '16 Sep ' 2016 PLF 2017 Apr ' * For Coal and Lignite based Power Plants 10%PLFAll India PLF Month-wise10.

8 All India PLF* Sector-wise for Sep. India % PLFS ector-Wise Plant Load Factor for Apr, 2016 and Sep, 2017 Sep '16 Sep ' TitleAxis TitleAll India PLF Month-wise201620172010-112011-122012-132 013-142014-15T&D (P)AT&C (P)Note: As per PFC for utilities selling directly to consumersP: ProvisionalTotal Number of Villages597464 Pump sets Energised as on 31-03-201620434180###Note: From the year 2004-05 onwards Definition of Village Electrification:-A village would be declared Electrified ifWithout Subsidy Gap ACS-ARR( Without Subsidy) Paise/unitGap ACS-ARR (on subsidy booked basis) paise/unitGap ACS-ARR (on subsidyreceived basis) paise/unit2013-1440011876772014-15412108 5860 Source:- PFC Reports on the performance of State Power Utilities2014-1510102015-161075* # (Gross Generation+Net Import) / Mid Year Population,* Provisional2013-14 ** Actual11 Pump sets Energised as on 30-09-17 Average cost of supply(ACS) (paise/unit)i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists.

9 (For electrification through Non-Conventional Energy Sources a Distribution Transformer may not be necessary)Figures are based on the data available in DDUGJY All India Coal consumption for Power Generation (MT)52014. All India per capita consumption of electricity ( KWh) #Average Revenue Realization(paise/unit)21185563518 Yearii) electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. andiv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be Average cost of Power & Average Realisation iii) The number of households electrified should be at least 10% of the total number of households in the village*Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports.

10 The data in the report prior to October, 2015 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also been adjusted for changes observed from Census 2011 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports11. T & D and AT&C Losses (%) 12. All India Village Electrification & Pumpsets Energised as on Villiages Electrified (Nos.) as on 396*% Villages electrifiedSNContentsPage1 Capacity Addition Targets and Achievements in 12th Plan122 Capacity Addition Targets & Achievements during Sep 2017 and April 2016 to Sep 2017133 Installed Capacity in various Regions including their B - Capacity Addition (i)Targets(MW)Type/SectorCentralStatePri vateTotalThermal14.