Example: tourism industry

GUA Series Condulet® Outlet Boxes - Cooper …

GUA Series condulet Outlet BoxesInstallation & Maintenance InformationSAVE THESE INSTRUCTIONS FOR FUTURE REFERENCEIF 1730 APPLICATIONGUA Outlet Boxes installed in conduit and cable systems within hazardous areas to protect conductors in threaded rigid conduit, act as pull and splice Boxes in conduit or cable systems, interconnect lengths of conduit, change direction of conduit and provide access to conductors for maintenance and future system Series Outlet Boxes are suitable for use indoors or outdoors in Class I and Class II hazardous areas as defined by the National Electrical Code and the Canadian Electrical statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable.

GUA Series Condulet® Cajas de tomacorriente Información de instalación y mantenimiento GUARDE LAS INSTRUCCIONES PARA FUTURAS REFERENCIAS IF …

Tags:

  Series, Cooper, Boxes, Outlet, Mantenimiento, Condulet, Gua series condulet, 174 outlet boxes

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of GUA Series Condulet® Outlet Boxes - Cooper …

1 GUA Series condulet Outlet BoxesInstallation & Maintenance InformationSAVE THESE INSTRUCTIONS FOR FUTURE REFERENCEIF 1730 APPLICATIONGUA Outlet Boxes installed in conduit and cable systems within hazardous areas to protect conductors in threaded rigid conduit, act as pull and splice Boxes in conduit or cable systems, interconnect lengths of conduit, change direction of conduit and provide access to conductors for maintenance and future system Series Outlet Boxes are suitable for use indoors or outdoors in Class I and Class II hazardous areas as defined by the National Electrical Code and the Canadian Electrical statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable.

2 The accuracy or completeness thereof are not guaranteed. In accordance with Crouse-Hinds Terms and Conditions of Sale, and since conditions of use are outside our control, the purchaser should determine the suitability of the product for his intended use and assumes all risk and liability whatsoever in connection therewith. Eaton s Crouse-Hinds Business IF 1730 1201 Wolf Street Syracuse, NY 13208 Revision 1 Copyright 2014 New 10/14 INSTALLATION1.

3 Disconnect electrical power to Thread body hand-tight on the end of the conduit section. Tighten body onto conduit until wrench-tight and parallel to the mounting surface. 3. Install the next length of conduit into an open hub of the conduit body. Tighten conduit wrench-tight to the GUA Outlet Support the conduit on both sides of the GUA Outlet box using conduit clamps. 5. Unthread enclosure cover and carefully set aside to prevent damage to cover Pull or thread wires carefully through the conduit system, to avoid damage to conductor insulation. Wire fill must comply with the NEC or other local codes. 7. Make splices as needed in the Outlet box. Insure that the ground wire is securely connected to the ground screw provided in the GUA.

4 Test wiring for correctness with continuity checks, and also for unwanted grounds with insulation resistance Lubricate pipe plugs with Crouse-Hinds STL lubricant, and close all unused hubs. Install plugs Inspect cover to insure that the o-ring is undamaged. Insure the o-ring is positioned next to the flange of the cover. 10. Thread the cover onto the Outlet box, and tighten, using a bar in the wrenching ears to fully thread the cover in place. The o-ring on the cover will be seated into the top of the Outlet box when the cover is fully WITH OPTIONAL TERMINAL BLOCKSThe Outlet box may be equipped with factory-installed terminal blocks. To use the terminal blocks, strip the wire according to Table 1, insert the stripped end of the wire into the terminal block, and tighten the terminal screws to the torque listed in the table.

5 Table 1 MAINTENANCE1. In addition to these required maintenance procedures, we recommend an Electrical Preventive Maintenance Program as described in the National Fire Protection Association Bulletin NFPA 70B: Recommended Practice for Electrical Equipment Maintenance ( ).2. Frequent inspection should be made. A schedule of maintenance checks should be determined by the environment and frequency of use. It is recommended that it should be at least once a Perform visual, electrical and mechanical checks on all components on a regular basis. Visual checks for undue heating evidenced by discoloration of wires or other components, damaged parts or leakage evidenced by water or corrosion in the interior. Electrically check to make sure that all connections are clean and tight.

6 Mechanically check that all parts are properly care to prevent dirt, grit, or other foreign material from lodging into threads. If any such material settles on the threads, clean them with kerosene or Stoddard Solvent, then relubricate them with Crouse-Hinds STL thread avoid explosion hazard, always disconnect primary power source before opening enclosure for inspection or SuffixWire Size AWG [mm2]Strip Length inch [mm]Torque lbf-in [N-m]DIN24 2 [ 4].31 [8] 7 [ ]TB24 2 [ 4].31 [8] 7 [ ]Bo tes prises condulet s rie GUAI nformation sur l installation et l entretienCONSERVEZ CES INSTRUCTIONS POUR VOUS Y R F RER ULT RIEUREMENTIF 1730 UTILISATIONLes bo tes prises GUA install es dans des r seaux de conduits ou de c bles situ s dans des espaces dangereux afin de prot ger des conducteurs se trouvant dans des conduits rigides filet s agissent en bo tes de tirage et de branchement, permettent de relier des longueurs de conduits, de changer la direction de conduits et d acc der des conducteurs des fins d entretien et de modifications ult rieures du r Couper l alimentation lectrique du Ins rer la main le corps de la bo te sur l extr mit de la section de conduit.

7 Serrer le corps de la bo te sur le conduit au moyen d une cl , parall lement la surface de Placer la longueur suivante de conduit dans un manchon d entr e ouvert du corps. Serrer le conduit l aide d une cl sur la bo te prises Supporter le conduit des deux c t s de la bo te prises GUA au moyen de brides de conduits. 5. D visser le couvercle du bo tier et le mettre d licatement de c t pour viter d endommager ses Tirer ou ins rer les fils avec pr caution dans le r seau de conduits afin de ne pas endommager l isolation des conducteurs. Le fil doit tre conforme au Code national de l lectricit ou d autres codes Effectuer les pissures n cessaires dans la bo te prises. S assurer que le fil de mise la terre est solidement raccord la vis de mise la terre qui se trouve dans la bo te GUA.

8 S assurer que le c blage est correct au moyen de contr les de continuit et rechercher les mises la terre ind sirables l aide d un testeur de r sistance de l Lubrifier les fiches de tuyaux avec du lubrifiant STL Crouse-Hinds, et obturer tous les manchons d entr e inutilis s. Serrer les bouchons avec une cl .9. Inspecter le couvercle pour s assurer que le joint torique n est pas endommag . V rifier que le joint torique est positionn c t de la bride du couvercle. 10. Visser le couvercle sur la bo te prises et le serrer fond au moyen d une barre pass e dans les oreilles de serrage. Le joint torique du couvercle doit s asseoir sur le dessus de la bo te prises lorsque le couvercle est compl tement serr .C BLAGE AVEC DES BORNIERS EN OPTIONLa bo te prises peut tre dot e de borniers install s en usine.

9 Pour utiliser les borniers, d nuder le fil conform ment au tableau 1, ins rer l extr mit d nud e du fil dans le bornier et serrer les vis des bornes au couple indiqu dans le tableau. Tableau 1 ENTRETIEN1. En plus de ces proc dures d entretien requises, nous recommandons un programme d entretien lectrique pr ventif, comme celui qui est d crit dans le National Fire Protection Association Bulletin NFPA 70B : Recommended Practice for Electrical Equipment Maintenance ( ).2. De fr quentes inspections doivent tre faites. Un calendrier de v rifications d entretien doit tre tabli en fonction de l environnement et de la fr quence d utilisation. Il est recommand que ces v rifications aient lieu au moins une fois par Effectuer r guli rement des v rifications visuelles, lectriques et m caniques de tous les composants.

10 Rechercher les indices visuels d une surchauffe, comme une d coloration de fils ou d autres composants et les pi ces endommag es mises en vidence par de l eau ou de la corrosion internes. Faire des v rifications lectriques pour s assurer que toutes les connexions sont propres et serr es. Faires des v rifications m caniques pour s assurer que toutes les pi ces sont bien mont soin d viter que de la salet , des clats ou d autres corps trangers ne se logent sur les filets. Si un tel cas se produit, nettoyer les filets avec du k ros ne ou du solvant Stoddard, puis les lubrifier avec du lubrifiant de filets STL viter tout risque d explosion, toujours coup e la source d alimentation primaire avant d ouvrir le bo tier des fins d inspection ou d viter les risques d explosion : L alimentation lectrique doit tre COUP E avant et pendant l installation et l entretien.


Related search queries